ML18054A801

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-255/89-10 on 890327-31.No Violations Noted
ML18054A801
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/16/1989
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18054A802 List:
References
NUDOCS 8906230194
Download: ML18054A801 (2)


See also: IR 05000255/1989010

Text

Docket No. 50-255

Consumers Power Company

ATTN:

D~vid P. Hoffman

Vice President

Nuclear Operations

1945 West Parnall Road

Jackson, MI

49201

Gentlemen:

JUN t 6 1989

This refers to.the routine safety inspection conducted by Mr. R. Bocanegra

of this office on March 27-31, 1989, of activities at Palisades Nuclear

  • Generating .Plant authorized by NRC Operating License No. DPR-20 and to the

discussion of our findings with Mr. G. B. Slade and others of your staff at

  • the conclusion of the inspection, a telephone conversation with Mr. T. Neal

on April 20, 1989, a meeting at NRC Region III office with members of your

staff on April 27, 1989, and a telephone conference on May 19, 1989 with

members of .your staff.

-

.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedur~s and representative records, observations, and

interviews with personnel.

In addition, our Mobile Laboratory was at the site

during the inspection to perform independent measurements of radioactivity.

While no violations of NRC requirements were identified during this inspection,

we are concerned with the history of eq~ipment breakdown and slow maintenance

turnaround time for the Post Accident Sample Monitor System (PASM).

Your

staff has initiated an action plan to imprpve PASM reliability, which was

discussed by our staffs at the April 27, 1989 meeting in Region III and May 19,

1989 telephone conference.

Pursuant to these discussions, we request that you

submit an updated action plan together with a suitable timetable for its

completion.

Concerning an unrelated matter, we also request a description of

your-plans for improving QA oversight of vendor laboratories providing

radiological analyses for strontium and yttrium.

In accordance with 10 CFR 2.790 of the Commission

1 s regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

~ (\\

/

' \\'J

/'\\:,'*** \\

> , . c I

Consumers Power Company

2

JUN 1 G 1989

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/89010(DRSS)

cc w/enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

Gerald B. Slade, General Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Michigan Department of

Public Health

~/cg

~

Schumacher

9t;

Sincerely,

~-p/)A __ ~

Char~~1us, Director

Division of Radiation Safety

and Safeguards