Monthly Operating Rept for Apr 1989 for Palisades Nuclear Plant
ML18054A748
Person / Time
Site: Palisades 
Issue date: 04/30/1989
From: Goralski G, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905230073
Download: ML18054A748 (4)


Text

\\

..,/*,,,.-,-.,.

.*~

~" "'"" "

POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 10, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, 1989.

~~

George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-420B DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-324 GBSzczotka, P-21-311B HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*012

  • ,;()52::::(><)7:3 PDF!:

r~:OOC~:::

904
~:0 05000255 F'DC I...

"\\

OC0185-0001A-OP03 A CMS e:NERGY COMPANY

OPERATING DATA REPORT DOCKET NO ~~~~5~0_-_2~5~5 DATE ~~-0~5_-_1~0_-~8~9 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 OPERATING STATUS NOTES

1.

Unit Name: Palisades

~..,....--~~~~~~~~~~~~~~~~

2.

Reporting Period:

890401-890430

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe):

~"*770

7.

Maximum Dependable Capacity (Net MWe):

  • "k730
8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

Power Level to Which Restricted, if any (Net MWe):

623 (80%)

Reasons for Restrictions, if any:

80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability (not based upon any regulatory requirements).

Hours In Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours This Month 719.0 719.0 719.0 Yr-.to-Date 2,879.0 2,163.9 2,147.0 Gross Thermal Energy Generated (MWH) 1,392,120 4,298,184 Gross Electrical Energy Generated (MWH) 451,570 1,392,200 Net Electrical Energy Generated (MWH) 422,835 1,306,097 Unit Service Factor 100.0 74.6 Unit Availability Factor 100.0 74.6 Unit Capacity Factor (Using MDC Net) 80.6 62.1 Unit Capacity Factor (Using DER Net) 73.1 56.4 Unit Forced Outage Rate 0.0 25.4 Cumulative 152,222.0 81,171.3 77,269.1 162,849,189 50,936,685 47,953,346 50.8 50.8

  • 48.4 39.1 34.9 Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

45 day scheduled maintenance outage for steam generator repair to start October 1 1989.

If Shut Down at End of Report Period, Estimated Date of Start Up:

Units in Test Status (Prior to Connnercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast Achieved
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03

~

AVERAGE DAILY UNIT POWER LEVEL~

DOCKET NO 50-255


=----

UN IT Palisades


'"-="--:---:-'-

DATE 05-10-89


=-==---___;;._

COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH __

_..;..A_P.;;;.;R=I=L-'1;:_:9:....:8:....:9 __ _

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 454 17 615 2

434 18 618 3

453 19 617 4

464 20 615 5

536 21 610 6

538 22 614 7

583 23 616 8

601 24 619 9

618 25 616 10 618 26 613 11 615 27 614 12 616 28 622 13 616 29 617 14 614 30 620 15 617 16 615 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

SUMMARY

OF OPERATING EXPERIENCE FOR APRIL, 1989 Palisades began the month of April with power being maintained at 60%.

Reactor power was then increased 10% on April 4 and again on April 7.

Power was then maintained at 80% for the remainder of the month.

OC0185-0001E-OP03