Notice of Violation from Insp on 890314-0410.Violation Noted:Licensee Failed to Do Between Seal Test of Escape Air Lock Door within 3-days After Door Used on 890302
ML18054A717
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/21/1989
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18054A716 List:
References
50-255-89-09, 50-255-89-9, NUDOCS 8905050135
Download: ML18054A717 (1)


Text

NOTICE OF VIOLATION Consumers Power Company Docket No. 50-255 As a result of the inspection conducted on March 14 through April 10, 1989, and in accordance with the General Policy and Procedures for NRC Enforcement Actions {10 CFR Part 2, Appendix C), the following violation was identified:

10 CFR Part 50, Appendix J, III.D.2.{b) (iii) states that air locks opened during periods when containment integrity is required by the plant's Technical Specifications shall be tested within 3 days after being opened.

For air lock doors having testable seals, testing the seals fulfills the 3-day test requirements.

Contrary to the above, the licensee failed to do a between the seal test of the escape air lock door within 3 days after the door was used on March 2, 1989.

This is a Severity Level IV violation (Supplement I).

Pursuant to the* provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be giveti to extending your response time for good cause shown. -

Dated W. L.~

Chief Projects Branch 2

.. *.. **.