NOTICE OF VIOLATION Consumers Power Company Docket No. 50-255 As a result of the inspection conducted on March 14 through April 10, 1989, and in accordance with the General Policy and Procedures for NRC Enforcement Actions {10 CFR Part 2, Appendix C), the following violation was identified:
10 CFR Part 50, Appendix J, III.D.2.{b) (iii) states that air locks opened during periods when containment integrity is required by the plant's Technical Specifications shall be tested within 3 days after being opened.
For air lock doors having testable seals, testing the seals fulfills the 3-day test requirements.
Contrary to the above, the licensee failed to do a between the seal test of the escape air lock door within 3 days after the door was used on March 2, 1989.
This is a Severity Level IV violation (Supplement I).
Pursuant to the* provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be giveti to extending your response time for good cause shown. -
Dated W. L.~
Chief Projects Branch 2
.. *.. **.