ML18054A310

From kanterella
Jump to navigation Jump to search

Informs That Licensee 880509 Response to NRC 880217 Generic Ltr 88-03, Steam Binding of Auxiliary Feedwater Pumps, Satisfactory & No Further Action Necessary
ML18054A310
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/25/1988
From: Wambach T
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
GL-88-03, GL-88-3, TAC-67255, NUDOCS 8806030074
Download: ML18054A310 (3)


Text

.

~: j~)

,.1

,,. '*~*!.* \\,

I

~

i:*.

May 25, 1988

. It'..

r
  • ~

Docket No. 50-255 Mr. Kenneth W~ Berry..

Director, Nuclear Licensing

  • Consumers Power*company 1945 West Parnall Road Jackson~ Michigan 49201

Dear Mr. Berry:

SUB~ECT:

GENERIC LETTER 88-03~ "STEAM BINDING OF AUXILIARY FEEDWATtR PUMPS (TAC NO.. 67255)

  • On February.17, 198~, Gen~ric Let.ter 88-03 was issued.and requested ail 1 i censees of operatfog PWRs and ho 1 de rs of ¢onstructiori. permits for PWRs to ~onftrm.. that appropriate procedures ~re in place, and will be maihtained, to minimize the occ~rrence of* ste*am. binding of the auxi 1 i ary Jeedwater (AFW) pumps.

The procedures require monitoring fluid conditions within the AFW system each shift durin~ times whe~ th~ system is ~equired to be operable, and recognizing steam bi ridi rig "and restoring the AFW system.. to.;operab 1 e. status.

should steam bindfng.'o.ccur.* ***

  • r
  • ~

. Your response,. dated. May 9, 1988; colifi rmed that you *have i 1J.p*1 ace, 'and*

will maintain, :the* necessary Procedures.

Thus, your response to Genedc Letter 88-03 is satisfactory anq_ no further a~tior:i is necessary.

cc:

See next page

'DISTRIBUTION l[ock~t_E_i_les cl NR*c-& Local. PDR~

GHolahan

  • Twambach Ringram OGC-WFl
  • EJordan *
    • . JPartlow f\\CRS (10}
.* PD31 Plant* Gray.

I r

OFFICE:

'.SURNAME:

DATE: "

LA/PD31: D.RSP,..

Ringrainf'-

05//~ /88.*

8806030074 880525 PDR ADOCK 05000255 p

PDR i '

Sincerely*, '..:

.~*

9riginal signed by Thomas* v: Wambach, *Pt~ject' Manager Pr6ject Directorate III-1 *

.'Division of Reactor Projects - IIJ;* *

.,IV, V &* Sped a 1 Proj ~cts

  • ~1/#'

PM/~f:'DRSP D/P~3

~DRSP TWambach: rl Dt1tiJ 05/fC//88

  • o.Y" L// a OFFIC1AL RECORD COPY
    • 1

. ~;

~ ~- -.

'*'..{

  • ~

.. -. ~------.--:---.-..

-:----~

--~ __ *---... _ ----.(

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-255 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

May 25, 1988

SUBJECT:

GENERIC LETTER 88-03, 11STEAM BINDING OF AUXILIARY FEEDWATER PUMPS (TAC NO. 67255)

On February 17, 1988, Generic Letter 88-03 was issued and requested all licensees of operating PWRs and holders of construction permits for PWRs to confirm that appropriate procedures are in place, and will be maintained, to minimize the occurrence of steam binding of the auxiliary feedwater (AFW) pumps.

The procedures require monitoring fluid conditions within the AFW system each shift during times when the system is required to be operable, and recognizing steam binding and restoring the AFW system to operable ~tatus should steam binding occur.

Your response, dated May 9, 1988, confirmed that you have in place, and will maintain, the necessary procedures.

Thus, your response to Generic Letter 88-03 is satisfactory and no further action is necessary.

cc:

See next page Sincerely,

~

.. v1/aJ--L Thomas V. Wambach, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects

) c

. I-Mr. Kenneth W. Berry Consumers Power Company cc:

M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr. Gerald B. Slade Plant General Manager Palisades Plant 27780 Blue Star Memorial Hwy.

Covert, Michigan 49043 Resident Inspector c/o U.S. Nuclear Regulatory Commission Palisades Plant 27782 Blue Star Memorial Hwy.

Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909