Ack Receipt of Requesting Change to Plant Site Emergency Plan,Specifically,Change to Min Shift Staffing Guidelines.Changes Will Not Decrease Effectiveness of Emergency Plan Although Some Items Need Clarification
ML18053A687
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/28/1988
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8812060129
Download: ML18053A687 (2)


Text

i*

Docket No. 50-255

  • Consumers Power Company ATTN:

David P. Hoffman Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:

NOV 2 8 1988 This is to acknowledge receipt of your lette~ of November 1, 1988, requesting a change to the Palisades Site-Emergency Plan~ specifically a change to the minimum shift staffing guidelines as listed in Fi~ure 5-6 of Section 5 of the SEP.

As we understand it, as a result of your owr:i review and the changing training requirements and qualifications for certain job positions listed in

  • Figure 5:..6, the Palisades plant can no longer take credit for previous er.ass training that allowed certain employees to be available during the first 30 minutes of an emergency condition.

Based on. several recent discussions be*tween Mr. Norman Brott, the Palisades Emergency Preparedness Coordinator, and Messrs. William Snell and James Patterson of my staff on these proposed changes plus our* own independent review; it is our decision that these changes will not decrease the effectiveness of your emergency plan.

. As we have discussed with Mr. Brott, certain items need clarification and simplification to make a more useable emergency staffing chart~ We understand that the key positions for which you want to reduce the on-shift time below 24-hour-a-day coverage are Mechanical Maintenance, Ele~trical Maintenance and.

the HP Technicians.

Your proposal provides availability from 112 to 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> per week excluding holidays, with a 30* minute response capability of one to three persons for each of these three positions for time beyond 11?. to 120.

hours.

When these discussed changes have been incorporated into the pla~ and the plan submitted to us for final review, we will review the plan to ensure consistency with these approved changes.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.

However, if your safety review indicates no decrease in emergency preparedness effectiveness, then changes can be made without prior*NRC approval.

In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).

  • Also, changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR, Part 50, Appendix E,Section V (Implementing Procedures).

/

Consumers Power Company 2

NOV 28 1988 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this lettir wiJl be placed.in the NRC'~ Public Document Room.

If you have any questions concerning this letter, please contact Mr. James Patterson of my staff at (312) 790-5536.

cc:

RII I Mr. Kenneth W.Berry, Director Nuclear Licensing.

Gerald B. Slade, General Manager DCD/DCB (RIDS).

Licensing Fee Management ~ranch Resident Inspector, RIII

  • Ronald Callen, Michigan Public Service Commission Michigan Department of Publi~ Health T. V. Wambach, Licensing*

Project Manager, NRR W. Travers, EPB, NRR W. Weaver, FEMA RV R.

  • LaFreniere, RIII ye-s

. Grf f 11/i.~(j PatJ~~son/s.;

. '../.

I'-"'

RI II.

-~~

,,,%$/&'$.

Sincerely,

~

.. / _f(

L. Ro g, hief Emergency Preparedness and _