Proposed Tech Spec Changes Re Waiver of 100% Volumetric Exam of Upper Flywheel of Each Primary Coolant Pump for 1988 Refueling Outage
ML18053A515
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/19/1988
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18053A509 List:
References
NUDOCS 8808240198
Download: ML18053A515 (2)


Text

ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST August 19, 1988

(, ---=0-=0:-:0-:0-:2-:4-0_1_9_0_0_0_0_0~* 1--.-\\9=------'--~1 I

PDR ADOCK 05000.255 I

p

~f'IU TSP0888-0099-NL04 1 Page

\\

TABLE 4.3.2 Miscellaneous Surveillance Items Equipment

1.

Regenerative Heat Exchanger

a.

Primary Side Shell to Tube Sheet Welds

b.

Primary Head

2.

Primary Coolant Pump Flywheels Reactor Vessel Capsule Refueling Number Number Primary - Optional A-240 2

W-290 5

11 T-330 5

20 W-110 11 5

W-100 20 25 T-150 20 5

W-280 25 20 W-260 35 39 W-80 39 35 Method Frequency Volumetric 5-Year Maximum Interval (100%)

Volumetric 5-Year Maximum Interval (100%)

Volumetric 100% Uppe~ Flywheel Each Refueling TABLE 4.3.3 Surveillance Coupon Removal. Schedule Capsule 1 Target Removal Time Location EFPY* @*Refuel No Outside Core Barrel 2.26 @ 23 Vessel Wall 4.33 @ 5 Above Core 4.33 @ 5 Vessel Wall 9.21 @ 11 Vessel Wall 16.5 @ 20 Above Core 16.5 @ 20 Vessel Wall 20.6 @ 25 Vessel Wall 28.7@ 35 Vessel Wall 32.0 @ 39 1 Refer to Palisades FSAR, Volume 2, Section 4.5.3, Figure 11 for illustration of capsule locations.

2EFPY based on 2530 MWt power rating I

2 32.26 EFPY from BCL 585-12 Report, March 13, 1979 4 Primary Coolant Pump Upper Flywheel Volumetric 100% examination is waived I

for the 1988 Refueling Outage.

I 4-23 Amendment No.

Z~, 79, TSP0888-0099-NL04 I