Forwards SALP 8 Board Rept 50-255/88-01 Covering Period of May 1987 - May 1988,for Review
ML18053A511
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/15/1988
From: Bradley Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18053A512 List:
References
NUDOCS 8808240130
Download: ML18053A511 (2)


See also: IR 05000255/1988001

Text

1

_

{:*

-', **. *

, -
    • *.
  • . I ** *:

, .-

.

  • *

"" * ; ** --:,:...,: ,_._ *.. -~/ ~ ' .

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

"U" 1 *- 1988

i1

!)

0

Docket No. 50-255

Consumers Power Company

ATTN:

David P. Hoffman

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of September 2,

1988, is the SALP 8 Board Report for the Palisades Nuclear Generating

Station, covering the period of May 1, 1987 to May 31, 1988.

In accordance with NRC policy, I have reviewed the SALP Board Assessment and

concur with their ratings. It is my view that your conduct of nuclear activities

in connection with the Palisades facility was acceptable, but that further

management attention is required to assure that programs to improve performance

initiated during the past 12 months continue to be effectively implemented.

Specific areas I would like to highlight for your attention are:

1.

The ratings in the functional areas of Surveillance, Emergency Preparedness,

Security, and Outages improved to a Category 1, each from a previous Category 2

rating.

This improvement is attributable to increased management involvement

in these areas and responsiveness to NRC issues.

Likewise, ratings in the

functional areas of Maintenance and Quality Programs and Administrative

Controls Affecting Quality, improved to a Category 2, both from a previous

Category 3 rating.

These were the result of management emphasis on the

quality of corrective and preventive maintenance, along with a major

enhancement of plant material condition.

These ratings are commendable

and I encourage you to maintain this performance level.

2.

In the functional area of Plant Operations, a Category 2 rating with an

improving trend is noted, this is primarily due to improved event response

and enforcement history coupled with a decrease in operational events.

A positive performance trend has also continued in this area subsequent

to the evaluation period.

3.

Although a Category 2 rating was given in the functional area of Licensing,

4.

a declining trend was noted.

This is primarily due to insufficient details

in routine license amendment submittals and it is reconvnended that increased

management and technical resources be applied to both the backlog of licensing

actions and the proposed effort for Technical Specification improvement.

A Category 3 rating was given in the functional area of Fire Protection,

a decline from a previous Category 2 rating.

This decline resulted from

inadequate performance in correcting programmatic Appendix R deficiencies.

Increased management attention on your part is needed to assure resolution

of Appendix R issues.

....r13qo

8808240130 880815

~- I

PDR

ADOCK 05000255

l

_Q

PDC

  • I

_*.,. ..

Consumers Power Company

2

AUG 1 5 t988

It is noted that Engineering/Technical Support is a new functional area

assessed during this rating period.

While you will have sufficient opportunity to present your comments at the

meeting on September 12, 1988, we also request any written comments within

30 days after the meeting.

Upon receipt, your comments will be evaluated

and our conclusions relative to them will be provided to you.

In accordance with Section 2.790 of the NRC 1s

11 Rules of Practice,

11 Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the SALP Report,

and your response to this letter will be placed in the NRC Public Document Room.

Should you have any questions concerning the SALP Report, we would be pleased

to discuss them with you.

Enclosure:

SALP 8 Board

Report No. 50-255/88001

cc w/enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

Gerald 8. Slade, General Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Sincerely,

e./~~

A. Bert Davis

Regional Administrator

Ronald Callen, Michigan Public Service Commission

Michigan Department of Public Health

T. V. Wambach, Licensing Project Manager, NRR

Regional Administrators

RI, RII, RIV, and RV

L. W. Zech, Chairman

K. C. Rogers, Commissioner

T. M. Roberts, Commissioner

K. M. Carr, Commissioner

M. J. Virgilo, NRR Director, Project Directorate III-1

J. Lieberman, Director, Office of Enforcement

E. McKenna, SALP Coordinator, NRR

RIII PRR

RIII SGA

State Liaison Officer, State of Michigan

INPO

DRP, DRS, DRSS Section and Branch Chiefs