Forwards Safety Insp Rept 50-255/88-12 on 880509-0630 & Notice of Deviation.Concern Noted Re Lack of Adequate Assessment of Applicable App R Requirements & Lack of Supervisory Reviews
ML18053A489
Person / Time
Site: Palisades 
Issue date: 08/08/1988
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18053A490 List:
References
EA-88-140, NUDOCS 8808170146
Download: ML18053A489 (2)


See also: IR 05000255/1988012

Text

Docket No. 50-255

EA 88-140

Consumers Power Company

ATTN:

David P. Hoffman

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

AUG 8 19B8

This refers to the special safety inspection conducted by Messrs. R. Hodor,

K. Parkinson, and J. M. Ulie of this office on May 9-13, 18, 31, June 14,

29 and 30, 1988, of activities at the Palisades Nuclear Plant authorized by

NRC Operating License No. DPR-20 and to the discussion of our findings with

Mr. G. Slade at the conclusion of the inspection.

This inspection involved

a followup review of Sections III.G, J and L of 10 CFR Part 50~ Appendix R

as they relate to previous Appendix R inspection findings.

In addition, a

review of the fire protection organization was performed .

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective*

examination of procedures and represehtative records, observations, and

interviews wit8 personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements.

Certain other activities set forth in the enclosure to

this letter appear to be a deviation from a FSAR commitment which you have made

in previous correspondence with the Commission.

Regarding the deviation, please.

advise us in writing within (30) days of the date of this letter of the

corrective action you have taken or plan to take, showing the estimated date

of comp 1 et ion.

We are concerned with what appears to be a lack of an adequate assessment of

the applicable Appendix R requirements and a lack of supervisory.reviews to

assure the technical adequacy of that assessment.

We are particularly

concerned with those issues we have raised regarding the associated circuit

area of 10 CFR Part 50, Appendix R.

With respect to this area, we* request

that you address at the upcoming enforcement conference, the potential for

0th.er plant components to be susceptible to the spurious signal and/or common

enclosure concerns of 10 CFR Part 50, Appendix R.

8808170146 880808

PDR

ADOCK 05000255

Q

PDC

,\\ \\

'\\~oJ

-~

. *

Consumers* Power Company

2

AUG B 1988

We are releasing this report at this time for your information.

Following an

Enforcement Conference, you will be notified by separate correspondence of our

decision regarding enforcement actions based on the findings of this inspection.

No written re~ponse is required for the apparent violations until you are

notified of the proposed enforcement actions.

In accordance with 10 CFR 2.790 of the Commission

1 s regulations, a copy of

this letter and_ the enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/88012(DRS)

cc w/enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

Gerald B. Slade, General Manager

DCD/DCB (RIDS) .

_

.

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Michigan Department of

Public Health

J. Lieberman, OE

J. Goldberg, OGC

A. Datta, NL/S, RES/EME

C. McCracken, NRR/ECEB

A. Krasopoulos, RI/DRS

G. Wiseman, RII/DRS

A. Singh, RIV/DRS

C. Ramsey, RV/DRS

RIII

BLN

Sonalysts,

~e/crr ~~~ )7;ktson

8- 't-~~

'iS-1..1-i~

"4-Y-~~

Inc.

~

RIII

F

\\J..)\\t':> {~

~~t\\<<

\\ \\on

Grob

9 ) -3'3-

~ -~-'i\\'b

Sincerely,

-~ilRIGINAL S-!GNED BY. HUBERT J. MiLLER *

1 * .,,

Hubert J. Miller, Director

Division of Reactor Safety

RIII

NRR

RIII'\\.-

~nres ~ti*

~~'

b cki

Gaf!~er

8-S*S'O

~-if-~~

'

5" ti

R~

Buriess

ct\\~