ML18052B397
| ML18052B397 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 12/02/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8712070189 | |
| Download: ML18052B397 (2) | |
Text
I~.
Docket No. 50-255 Consumers Power Company ATTN:
Dr. F. W. Buckman Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
- e.
DEC 0 2 1987, This is to acknowledge receipt of your letter of November 2, 1987, which transmitted Revision 3 to Section l, Introduction; Revision 4 to Section 3, Site Emergency Plan Summary; and Revision 5 to. Section 6, Emergency Measures; of the Palisades Plant Site Emergency Plan.
These revisions were received in our office on November 6, 1987.
We have completed our review of the revised Sections 1, 3, and 6 of the Palisades Plant Site Emergency Plan and have determined that with these changes, the plan is still consistent with the requirements of 10 CFR 50.54(q).
These changes do not decrease the effectiveness of the plan.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any chariges to your plan which may decrease the effectiveness of the plan.
However, if your safety review indicates no decrease in emergency preparedness effectiveness, then changes can be made without prior NRC approval.
In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Proc~dures).
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.
If you have any questions concerning this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.
871 ::*02 8712070189 PDR ADOCK 05000255 F
PDR See Attached Distribution Sincerely, "Original sigt".e~ by VT. D. Shafer*
W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch I
~r Rill t
- RIIL, R:i I I
( ~~
1 "GS2
~ ~~
/yG ~~
Palte on/err
\\
11/-,:/s7
- Bur~ess
't,\\f>i yti
Consumers Power Company Distribution cc:
Mr. Kenneth W. Berry, Director Nuclear Licensing David P. Hoffman, General Manager DCD/DCB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Michigan Department of Public Health W. Weaver, FEMA, RV D. Matthews, EPB, NRR R. LaFreniere, RIII I
2
.DEC 0 2 1987