ML18052B132
| ML18052B132 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/10/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18052B133 | List: |
| References | |
| NUDOCS 8706160705 | |
| Download: ML18052B132 (3) | |
See also: IR 05000255/1987012
Text
'.
Docket No. 50-255
- Consumers Power Company*
ATTN:
Dr. F. W. Buckman
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI
49201
Gentlemen:
JUN 10 1981
This refers to the routine inspection conducted by Mr. J. Patterson and others
of this office on May 18-20, 1987, of activities at Palisades Nuclear Power
Plant authorized by NRC Operating License No. DPR-20 and to the discussion of
our findings with Mr. W. Beckman and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the* inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
However, one weakness was identified which will require corrective
action by your staff. This weakness is summarized in Enclosure 1,
11EXERCISE
WEAKNESS,
11 of this letter.
As required by 10 CFR Part 50, Appendix E (IV.F),
any weaknesses that are identified must be corrected.
Accordingly, please
advise us within 45 days of the date of this letter of the corrective actions
you have taken or plan to take, including the estimated dates of completion.
In accprdance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room. *
We will gladly discuss any questions you have. concerning this inspection.
~6R616o7os 070610
G
- .ADOCK 05000255
P'l)R
..
Enclosure:
Inspection Report
No. 50-255/87012(DRSS)
See Attached Distribution
Sincerely,
"'Original signed by W. Snell"*
W. D. Shafer, Chief
Rqdiological Protection Branch
RIII Qf(f
Patte~on/nma
R!II ~:faoitt Rl~
Chri staffer
- fne 11
r.p/10 / '
7
Consumers Power Company
Distribution
cc w/enclosure:
Mr. Kenneth W. Berry, Director
Nuclear Licensing
J. F. Firlit, General Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Nuclear Facilities and
Environmental Monitoring
Section
D. P. Hoffman, General Manager
0. Matthews, EPB, OIE
W. Weaver, FEMA, RV
2
JUN 10 1987
EXERCISE WEAKNESS
The medical drill was not acceptable. This included the initial response to
an injured man in the plant plus coordination with ambulance personnel and
duties at the hospital emergency facility by licensee personnel.
Palisades
Emergency Implementing Procedure (EIP) EI-14, Medical Care/Treatment of
Contaminated Injured Personnel, and EIP, EIP-3 were not ~ollowed.
(50-255/87012-02) (Section 4.d)