Forwards Insp Rept 50-255/87-12 on 870518-20.No Violations Noted
ML18052B132
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/10/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18052B133 List:
References
NUDOCS 8706160705
Download: ML18052B132 (3)


See also: IR 05000255/1987012

Text

'.

Docket No. 50-255

  • Consumers Power Company*

ATTN:

Dr. F. W. Buckman

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

JUN 10 1981

This refers to the routine inspection conducted by Mr. J. Patterson and others

of this office on May 18-20, 1987, of activities at Palisades Nuclear Power

Plant authorized by NRC Operating License No. DPR-20 and to the discussion of

our findings with Mr. W. Beckman and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the* inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

However, one weakness was identified which will require corrective

action by your staff. This weakness is summarized in Enclosure 1,

11EXERCISE

WEAKNESS,

11 of this letter.

As required by 10 CFR Part 50, Appendix E (IV.F),

any weaknesses that are identified must be corrected.

Accordingly, please

advise us within 45 days of the date of this letter of the corrective actions

you have taken or plan to take, including the estimated dates of completion.

In accprdance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room. *

We will gladly discuss any questions you have. concerning this inspection.

~6R616o7os 070610

G

  • .ADOCK 05000255

P'l)R

..

Enclosure:

Inspection Report

No. 50-255/87012(DRSS)

See Attached Distribution

Sincerely,

"'Original signed by W. Snell"*

W. D. Shafer, Chief

Emergency Preparedness and

Rqdiological Protection Branch

RIII Qf(f

Patte~on/nma

R!II ~:faoitt Rl~

Chri staffer

  • fne 11

r.p/10 / '

7

Consumers Power Company

Distribution

cc w/enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

J. F. Firlit, General Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Nuclear Facilities and

Environmental Monitoring

Section

D. P. Hoffman, General Manager

0. Matthews, EPB, OIE

W. Weaver, FEMA, RV

2

JUN 10 1987

EXERCISE WEAKNESS

The medical drill was not acceptable. This included the initial response to

an injured man in the plant plus coordination with ambulance personnel and

duties at the hospital emergency facility by licensee personnel.

Palisades

Emergency Implementing Procedure (EIP) EI-14, Medical Care/Treatment of

Contaminated Injured Personnel, and EIP, EIP-3 were not ~ollowed.

(50-255/87012-02) (Section 4.d)