Forwards Safety Insp Rept 50-255/87-10 on 870420-24.No Violation Noted.Nrc Expects Util to Meet Commitment of Conducting One call-in Drill Before 870701,w/second Drill Conducted within 90 Days of First
ML18052B006
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/12/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18052B008 List:
References
NUDOCS 8705180285
Download: ML18052B006 (2)


See also: IR 05000255/1987010

Text

i'

I

Docket No. 50-255

Consumers Power Company

ATTN:

Dr. F. W. Buckman

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

MAY 12 1987,

This refers to the routine safety inspection conducted by_Mr. J. Patterson

and others of this office 9n April 20-24, 1987 of activities at the Palisades

Nuclear Power Plant authoriz~d by License No. DPR-20 and to the discussion of

our findings with Mr. J. Lewis, Mr. W. Beckman, and others of your staff at

the conclusion of the inspection.

The encloseq copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

However, we are_concerned with your inability to demonstrate

through telephone call-in drills that enough personnel can respond to meet

the goals of shift augmentation as listed in Figure 5-6 of your Site Emergency

Plan.

Successful demonstration of shift augmentation cannot be delayed until

your planned telecomputer dialing system and other aids are operational.

As

listed in Section 5 of this report, we expect you to meet the commitment of

conducting Qne_call-in drill before July 1, 1987, with a secon9 drill

conducted ~ithin 90 days of the first.

Documentation and critique results

should be included for each drill for our review at a later date.

In accordance with 10 CFR 2.790 of the Commission's_regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

8705180285 ~886~55

PDR

ADOCK

PDR

G

Enclosure:

Inspection Report

No. 50-255/87010(DRSS)

See Attached Distribution

RIII Qf/<

Patterqon/l ms

l

. ~*

Sincerely,

1'Qr1gina1 signed by W. D. Sha.f eT"

W. 0. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Riii ~v~~~

Christoffer

~IJJ

fui'~ess

5{n lg'1

RIIl

sWPer

Consumers Power Company

Distribution

cc w/enclosure:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

J. F. Firlit, General Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Nuclear Facilities and

Envi~onmental Monitoring

Section

D. Matthews, EPB, NRR

W. Weaver 1 FEMA, Region V

2