Ack Receipt of Forwarding Scope & Objectives for 1987 Annual Emergency Preparedness Exercise Scheduled for 870519.Objective 3.c Will Be Observed in Practice Drill After Exercise.Scope & Objectives Acceptable
ML18052A927
Person / Time
Site: Palisades 
Issue date: 04/03/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8704130145
Download: ML18052A927 (2)


Text

~ e:.t

.~

Docket No. 50-255 Consumers Power Company ATTN:

Dr. F. W. Buckman Vice President Nuclear Operations 212 West Michigan Avenue Jac~son, MI 49201 Gentlemen:

APR 0 3 1987 Thank you for your letter of March 5, 1987 which included a copy of Consumers Power Compa.ny' s scope anc object.i vcs for the 1987 Pali sades Pl ant 1 s arinua 1 emergency preparedness exercise scheduled for May 19, 19P-7.

Also, we understand that Objective 3c., Collection and Analysis of a Post Accident Primary Coolant Sample, will not be demonstrated due to installation of a new post accident sampling panel and the need for related training, both of which will not be completed prior to the ~ay 19, 1987 exercise. This item was addressed in your letter of March 12, 1987, from Mr. Brian 0, Johnson, Staff Licensing Engineer to the NPC Document Control Desk in Washington, P.C.

As explained in that letter, this unavailable post accident sampling panel was discussed between Mr. Anthony P. Y.atarsky of your staff ar.c Mr. James P. Patterson of Region lII.

We have no further questions ori Objective 3c., and we will observe the post acciderit sampling and analysis as an emergency function in a pr~ctice drill some time following the exercise.

All other aspects of the scope and objectives for the May 19, 19E7 annual exercise were acceptable.

My staff will provide further comments on the adequacy of the scenario when submitted and communicate them to "1r. Phillip Loomis, F.mergency Planning Administrator, approximately two to three weeks prior to the exercise.

Thank you for your timely submittal within the recommended 75 days prior. to the annual exercise.

8704130145 870403

~DR ADOCK 05000255 PDR

Consumers Power Company L.

AP R.O 3 1987-..

Jf you have any questions, please contact Mr. James F'. _Patterson of my staff at (312) 790-5536.

cc:

Mr. Kenneth W. 8erry, Director Nuclear Licensino J. F. Firlit, Gene~al Manag~r DCS/RSB (RIDS)

Licensing Fee Management Rranch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and Environmental Monitoring Section W. Weaver, FEMA, Region V D. Matthews, EPB, OIE RIII no/)

PatteJgR/ib v,,I' Sincerely, W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch RIIIO stJ1