ML18052A356

From kanterella
Jump to navigation Jump to search
Forwards Auxiliary Feedwater Sys Reliability Analysis, Per NRC Questions During Review of Main Steam Line Break Evaluation.Reevaluation of Auxiliary Feedwater Sys Reliability Using NUREG-0635 Revealed Sys Reliable
ML18052A356
Person / Time
Site: Palisades 
Issue date: 03/21/1986
From: Kuemin J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18052A357 List:
References
RTR-NUREG-0635, RTR-NUREG-635 NUDOCS 8603280237
Download: ML18052A356 (1)


Text

.:.-

consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 *:{5171766-0550 March 21, 1986

/,

Director, Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

AUXILIARY FEEDWATER SYSTEM RELIABILITY ANALYSIS

.i

/

/

/.

/

.. l I

In response to questions raised during the NRC review of the Palisades Main Steam Line Break Evaluat'ion, dated May 23, 1985, the enclosed Auxiliary Feedwater System Reliabiid.ty Analysis is submitted.

  • Members of the NRC staff I

and Consumers Power Compapy staff met in Bethesda on January 9, 1986 to discuss the reliabi.J'.ity o~ the AFW system as compared to that derived in the MSLB evaluation.

As a follow-up to the meeting, a reevaluation of the AFW system reliability using the guidelines of NUREG-0635 was conducted.

This reevaluation concludes that the AFW system is reliable and also provides justification for not equating the results of the MSLB AFW model with system reliability.

~~~

James L Kuemin Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment 8603200237. 060321 f /.1 PDR ADOCK 0500025S f 1