Dockei No. 50~255
- Mr. Kenneth W. Berry Director, Nuclear Licensing
- Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
January*29, 1986 Distribution:
NRC & L PDRs PKreutzer BGrimes ACRS 10 NWagner Docket File Branch Files TWambach EJordan OELD I Ahmed
SUBJECT:
INSTALLATION OF ISOLATION SWITCHES - 10 CFR 50.48 AND APPENDIX R BY submittal dated October 29, 1985, you requested approval in accordance with 10 CFR 50.48, Paragraph C.5_of the design of modifications to the*
control circuits of essential safe shutdown equipment.
These modifications consisted of manually operated isolation switches being installed that would isolate any potential faulting of control circuits in certain fire areas from the controls of equipment needed to safely shut down with a fire in that area.
In response to t~lephone inquiries from the NRC staff, you provided additional information by letters dated December 3 and December 20, 1985.
Your response of December 20, 1985 was revised on January 17, 1986.
We agree with your interpretation that if Palisades maintains the capability for achieving and maintaining cold shutdown for a fire in these critical areas by use qf these modifications, the requirement for providing the capability of powering equipment necessary for maintaining hot standby from both onsite and offsite sources specified in Section III.L.4 of Appendix R is not applicable.
The modifications you have proposed are hereby approved as described in the enclosed safety evaluation.
We understand these modifications were completed in the December 1985-January 1986 refueling outage.
Enclosure:
As stated cc w/enclosure:
See next page PBD#8 PKreutzer
. I
/86 Sincerely, Ashok C. Thadani, Director PWR Project Directorate #8 Division. of PWR Licensing-B PBD#8J"1/~BD#8 UV~
TWambach ;ef k,.AThadani I /:(8/86
~.. ( /.1l1/86
(
86020.30435 860129,... \\':\\. i
\\\\'
PDR ADOCK 05000255
.. LJ\\.. * ;-!
F PDR
/
I r
Mr. Kenneth W. Berry Consumers Power Company cc:
M. I. Miller, Esquire Isham, Lincoln & Beale 51st Fl oar Three First National Plaza Chicago, Illinois 60602 Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room Capitol Building Lansing, Michigan 48913 Palisades Plant ATTN:
Mr. Joseph F. Firlit Plant General Manager 27780 Blue Star Memorial Hwy.
Covert, Michigan 49043 Resident Inspector c/o U.S. NRC Palisades Plant 27782 Blue Star Memorial Hwy.
Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909