MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A4911996-02-0606 February 1996 Proposed Tech Specs Re Removal of cross-train Testing Requirements from LCO Action Statements ML18065A4411996-01-18018 January 1996 Proposed Tech Specs Allowing Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas ML18065A4361996-01-18018 January 1996 Proposed Tech Specs Re Primary Coolant Pump Flywheel Insps ML18065A4111996-01-10010 January 1996 Proposed Tech Specs,Requesting Exemption from 10CFR50 App J & TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3841996-01-0505 January 1996 Proposed Tech Specs,Revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3771995-12-27027 December 1995 Proposed Tech Specs,Rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3481995-12-11011 December 1995 Proposed Tech Specs,Revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 of TS Relocating in CPC Quality Program Description ML18065A3341995-12-0606 December 1995 Proposed Tech Specs,Relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1761995-10-17017 October 1995 Proposed Tech Specs,Changing Pressurizer Cooldown Limit from 100 to 200 F/H,Adding Word Shall to TS 3.1.2c,adding Average Hourly to Column Headings in TS 3.1.2c & Removing Action 3.3.3C from Page 3-31 to 3-30 ML18065A1241995-09-21021 September 1995 Proposed Tech Specs Re Diesel Generator Testing ML18064A8411995-07-0505 July 1995 Proposed Tech Specs,Deleting Section 6.4, Training, & Revising Sections 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7611995-05-0101 May 1995 Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests ML18064A7331995-04-27027 April 1995 Revised Proposed Ts,Consisting of Changes to Basis in First Paragraph of Page 3-2 & Rev to List of Approved Methodology Repts ML18064A7361995-04-27027 April 1995 Proposed Tech Specs,Supporting Action Statements for Inoperable Safety Valves in Proposed Specs 3.1.7 of TS Change Request of 950103 ML18064A6631995-03-30030 March 1995 Proposed Tech Specs for One Time Surveillance Deferment ML18064A6691995-03-24024 March 1995 Proposed TS Re pressure-temp Limits ML18064A6221995-02-20020 February 1995 Proposed TS Figure 3-4, LTOP Setpoint Limit. 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065B0331996-10-25025 October 1996 Proposed Tech Specs Change Request,Revising Administrative Controls Sections of Plant TS ML18065B0171996-10-18018 October 1996 Proposed Tech Specs,Providing Info Necessary for Completion of Review & Approval Process Re Writting Commitment Be Made That Description of Palisades Operating Requirements Manual Will Be Added to FSAR ML18065A9551996-10-0202 October 1996 Proposed Tech Specs 4.6.1 Re Safety Injection sys,4.6.2 Re Containment Spray sys,4.6.3 Re Pumps & 4.6.4 Re Valves ML18065A9111996-09-0404 September 1996 Proposed Tech Specs 3.7, Electrical Power Systems. ML20117K9581996-09-0303 September 1996 Proposed Tech Specs,Revising Administrative Control & Resolution of NRC Comments ML18065A8631996-08-14014 August 1996 Proposed TS Table 4.3.2 Re Miscellaneous Surveillance Items ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A5861996-03-29029 March 1996 Proposed Tech Specs,Upgrading Plant TS & Bases to Emulate STS for Combustion Engineering Plants,NUREG-1432,Rev 1 ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual 1999-09-30
[Table view] |
Text
ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATIONS PAGES November 21, 1985
=-::--:-:::-:-----:--,, 8 Pages i, 85112601 4 1 851121 05000255
!. ~DR ADOCK PDR TSP1185-0335-NL04
\. .'*
3.25 ALTERNATE SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3.25.1 The Alternate Shutdown System instrumentatio.n and components shown in Table 3.25.1 shall be OPERABLE. Operability shall be demonstrated by performing the surveillances in accordance with Section 4.20.
APPLICABILITY:
Reactoi coolant temperature > 325°F.
ACTION:
- a. With less than the "Minimum Equipment" in Table 3.25.1 Operable, restore the inoperable equipment to Operable with 7 days, or provide equivalent shutdown capability and restore the inoperable equipment to Operable within 60 days; or be in Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- b. The provisions of Specification 3.0.3 and 3.0.4 do not apply.
Basis The operability of the Alternate Shutdown System ensures that any fire will not preclude achieving safe shutdown. The Alternate Shutdown System components are independent of areas where a fire could damage systems normally used to shut down the reactor. This capability is consistent with Regulatory Guide 1.97 and Appendix R to 10CFR50.
3-134 Proposed TSP1185-0335-NL04
Table 3.25.1 ALTERNATE SHUTDOWN MINIMUM EQUIPMENT Minimum Readout No Instrumentation Equipment Location 1 Pressurizer Pressure 1 Cl SO (PI-OllO) 2 Pressurizer Level 1 ClSO (LI-0102E) 3 Reactor Coolant Hot Leg l/Loop ClSOA Temperature (TI-0112HAA)
(TI-0122HAA) 4 Reactor Coolant Cold Leg l/Loop ClSOA Temperature (TI-0112CAA)
(TI-0122CAA) 5 Steam Generator Pressure l/S.G. ClSOA (PI-0751E)
(PI-0752E) 6 Steam Generator Level l/S.G. Cl SO (LI-0757C)
(LI-0758C) 7 Start-up Range Neutron 1 ClSOA Monitor (N-OOlA) 8 Auxiliary Feedwater 1 Cl SO Suction Pressure (PS-0741D) 9 SIRW Tank Level 1 ClSOA (LT-0332B) 10 Auxiliary Feedwater l/S.G. Cl50 Flow Rate (FI-0727B)
(FI-0749B) 3-135 Proposed TSP1185-0335-NL04
Table 3.25.1 (Continued)
ALTERNATE SHUTDOWN MINIMUM EQUIPMENT Transfer Minimum Switch No Switches Equipment Location Function 11 HS-0102A 1 Cl50 Control Room Alarm 12 HS-0102B 1 Cl50 S/G Level Indications Pressurizer Level Indications Aux. FW Flow Indication Aux. FW Flow Control 13 HS-0522C Cl50 Opens Aux. FW Pump Steam Valve CV-0522B 14 HS-0102C 1 Cl50A Control Room Alarm S/G Pressure Indications Hot/Cold Leg Temperature Indications Minimum Controls No Control Circuits Eg,uiEment From Function 15 Auxiliary FW Flow 1 Cl50 Controls B S/G Control (HIC-0727C) Aux. FW Flow Control Valve (CV-0727) 16 Auxiliary FW Flow 1 Cl50 Controls A S/G Control (HIC-0749C) Aux. FW Flow Control Valve (CV-0749) 3-136 Proposed TSP1185-0335-NL04
4.7 EMERGENCY POWER SYSTEM PERIODIC TESTS 4~7.2 Station Batteries (Contd)
- b. Every three months, the specific gravity of each cell, the temperature reading of every fifth cell, the height of electrolyte, and the amount of water added shall be measured and recorded.
Basis The emergency power system provides power requirements for the engineered safety features in the event of a DBA. Each of the two diesel generators is capable of supplying the minimum required safeguards equipment from independent buses. (1, 2) This redundancy is a factor in establishing testing intervals. The monthly tests specified above will demonstrate operability and load capacity of the
. diesel generator. The fuel supply and various controls are -
continuously monitored and alarmed for abnormal conditions. Starting on complete loss of off-site power will be verified by simulated loss-of-power tests at approximately yearly intervals (during refueling shutdowns). Considering system redundancy, the specified testing intervals for the station batteries should be adequate to detect and correct any malfunction before it can result in system malfunction.
Batteries will deteriorate with time, but precipitous failure is extremely unlikely. The surveillance specified is that which has been demonstrated over the years to provide an indication of a cell becoming unserviceable long before it fails.
References :
(1) FSAR, Section 8.4.1.
(2) FSAR, Section 8.5.2.2.
4-43 Proposed TSP1185-0335-NL04
4.7 EMERGENCY POWER SYSTEM PERIODIC TESTS (Contd) 4.7.3 EMERGENCY LIGHTING SURVEILLANCE REQUIREMENTS 4.7.3.1 Each DC light powered by station batteries outside of containment shall be verified OPERABLE at least once a year. These same type of lights inside of containment shall be verified OPERABLE-prior to removal of the reactor head.
4.7.3.2 Each battery powered Emergency Lighting Unit (ELU) shall be verified functional at least once per year. Demonstration of OPERABILITY shall be performed every 24 months to prove minimum lighting duration of eight hours.
Basis The operability of the emergency lighting system ensures that sufficient lighting will be provided in all areas needed for operation of safe shutdown equipment and access/egress routes thereto.
References (1) Updated FSAR, Section 8.8 (2) Appendix R to 10CFR50, Section III J 4-43a Proposed TSP1185-0335-NL04
4.20 ALTERNATE SHUTDOWN SYSTEM SURVEILLANCE REQUIREMENTS 4.20.1 Each alternate shutdown monitoring instrumentation channel shall be demonstrated OPERABLE by performing a channel check and a channel calibration per Table 4.20.1.
4.20.2 Each alternate shutdown system transfer switch and control circuit shall be demonstrated OPERABLE by operating each activated component from the alternate shutdown panel, at least once per refueling cycle.
4-85 Proposed TSP1185-0335-NL04
TABLE 4.20.1 ALTERNATE SHUTDOWN MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Surveillance Surveillance Channel DescriEtion Function Freg,uencl'.: Method
- 1. Pressurizer Pressure Indication a. Check(l) Quarterly a. Compare independent (PI-:-0110) pressure readings
- b. Calibrate Refueling b. Known pressure applied Cycle to pressure sensor
- 2. Pressurizer Level Indication a. Check(l) Quarterly a. Compare independent (LI-0102E) level readings
- b. Calibrate Refueling b. Apply known differential Cycle pressure to level sensor
- 3. Reactor Coolant Hot Leg Temperature a. Check(l) Quarterly a. Compare independent Indication (TI-0112HAA) temperature readings (TI-0122HAA) b. Calibrate Refueling b. Substitute known Cycle resistance for RTD
- 4. Reactor Coolant Cold Leg Temperature a. Check(l) Quarterly a. Compare independent Indication (TI-0112CAA) temperature readings (TI-0122CAA) b. Calibrate Refueling b. Substitute known Cycle resistance for RTD
- 5. Steam Generator Pressure *Indication a. Check(l) Quarterly a. Compare independent (PI-0751E) pressure readings (PI-0752E) b. Calibrate Refueling b. Apply known pressure Cycle to pressure sensor
- 6. Steam Generator Level Indication a. Check(l) Quarterly a. Compare independent (LI-0757C) level readings
{LI-0758C) b. Calibrate Refueling b. Apply known differential Cycle pressure to level sensor 4-86 Proposed TSP1185-0335-NL04
TABLE 4.20.1 (Continued)
ALTERNATE SHUTDOWN MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Surveillance Surveillance Channel Description Function Frequency Method
- 7. Start-up Range Neutron Monitor a. Test Prior to a. Internal test signal (N-OOlA) startup(4)
- 8. Auxiliary Feedwater Low Suction Pressure Switch (PS-0741D) a. Calibrate Refueling a. Apply known pressure to cycle pressure sensor
- 9. SIRW Tank Level Indication a. Check(l) Quarterly a. Compare independent (LI-0332B) level readings
- b. Calibrate Refueling b. Apply known differential cycle pressure to level sensor
- 10. Auxiliary Feedwater Flow Rate(2)
Indication (FI-0727B) a. Calibrate Refueling a. Apply known differential (FI-0749B) cycle pressure to sensor(s)
- 11. Auxiliary Feedwater Flow Control(3) a. Check Refueling a. Verify Control Valves (CV-0727 & CV-0749) cycle
- 12. Auxiliary Feedwater Pump Inlet a. Check Refueling a. Verify Control Steam Valve. (CV-0522B) cycle NOTES:
(l)Quarterly checks are not required when the plant is less than 325°F.
(2)Satisfies Table 4.1.3-15 Requirement.
(3)See Specification 4.9b.
(4)Prior to each startup, if not done previous week.
4-87 proposed TSP1185-0335-NL04