Informs That Group Shift Turnovers as Discussed in Found Ineffective for Shift Supervisors/Engineers. Evaluation of Group Turnover for Control Operators Continues
ML18051B507
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/22/1985
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051B506 List:
References
NUDOCS 8508120540
Download: ML18051B507 (1)


Text

consumers Power company General Offices:

1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 May 22, 1985 James G Keppler, Administrator Region III.

US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR David J VandeWalle Director of Nuclear Licensing

/)

PALISADES PLANT - AMENDED RESPONSE TO NRC SALP 5 REPORT -

CORRECTION Our letter dated May 16, 1985 provided an amended response to the NRC SALP 5 report.

Our response in the Operations area addressed efforts to improve

.. shift turnovers including group turnover (as opposed to one-on-one turnovers)

.~for control operators and for shift supervisors/engineers.

In fact,

,,. one-on-one turnovers are being conducted for shift supervisors and shift engineers as the group turnover was found to be ineffective during a trial period.

Evaluation of the group turnover for control operators is continuing with a decision to continue the process or not expected in the near future.

~~B~~

David J VandeWalle Director, Nuclear Licensing CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades OC0585-0016B-NL02