ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATIONS PAGE CHANGE June 21, 1985 1 Page 8506250474 850621 .

~DR ADOCK 05000255:

PDR. :

IC0685-0226-NL04

4.9 Auxiliary Feedwater System Applicability Applies to periodic testing requirements of the turbine-driven and motor-driven auxiliary feedwater pump.

Objective To verify the operability of the auxiliary feedwater system and its ability to respond properly when required.

Specifications Demonstrate the operability of each auxiliary feedwater pump:

a. At least once per 31 days:

. 1. The operability of each motor-driven pump shall be confirmed as required by Specification 4.3.c. and Table 4.1.3 Item 16a.

2. The operability of'the steam-driven pump shall be confirmed as required by Specification 4.3.c. and Table 4.1.3 Item 16a.

The Provisions of Specification 3.0.4 are not applicable for entry into Hot Standby.

3. Verifying that each non-automatic .valve in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
b. At least once per 18 months by:
1. Verifying that each Automatic Valve (CV-0736A, CV-0737A, CV-0727 and CV-0749) actuates to its correct position (or that specified flow is established) upon receipt of a simulated auxiliary feedwater pump start signal.
2. Verifying that each pump breaker (or steam valve control for CV-0522B) receives an actuation signal upon receipt of an auxiliary feedwater actuation test signal.

Basis The periodic testing of Section 4.9.a. will verify auxiliary feedwater pump operability by recirculating water to the condensate storage tank and monitoring pump performance as specified in Section 4.3.c.

The operability testing of Section 4.9.b. will verify auto initiation of the auxiliary feedwater system by simulating a low steam generator level and observation of an*actuation signal for the electric-driven pump breakers and for the steam-driven pump valve control. Operability of the flow control valves (CV-0736A, CV-0737A, CV-0727 and CV-0749) will be verified through simulation of an auxiliary feedwater pump start signal and observing valve actuation to its correct position or by auxiliary feedwater system flow as monitored by installed instrumentation.

REFERENCES FSAR, Section 9.7.

Proposed 4-45 TSP0685-0226-NL04