ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGES May 2.3' 1985 8505290085 08550005022355

~DR ADOCK PDR 5 Pages IC0585-0203A-NL04

3.1 PRIMARY COOLANT SYSTEM (continued)

3. 1. 10 Leakage Detection Systems Specifications
a. The following primary coolant system leakage detection systems shall be OPERABLE, except as specified in part (b) below, whenever the reactor is above COLD SHUTDOWN. The minimum number of operable channels for each system is specified in Table 3.17.4.
1. A containment atmosphere monitoring system detecting gaseous radioactivity
2. A containm.ent atmosphere monitori~g system detecting humidity
3. A containment sump water level monitoring system
4. A containment air cooler condensate flow system
  • b. Operations may continue for a period of up to 30 days provided:
1. At least two of the four systems of part (a) are OPERABLE, and
2. Grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in the event that the gaseous containment atmosphere monitoring system is INOPERABLE.
c. If less than two systems of part (a) are OPERABLE, the reactor shall be placed in HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. Section 3.0.3 and 3.0.4 not applicable.

Basis Maintaining the primary coolant system leakage detection systems in accordance with section 3.1.10 abov~, assures that adequate leakage detection capability is available in addition to the daily primary coolant system inventory calculation.

References (1) Regulatory Guide 1.45 (2) NUREG-0820, October 1982 Section 4.15.2 (3) NRC Letter dated June 22, 1983 Proposed 3-25b TS0884-0001B-LI01-NL04

Table 3.17.4 (Cont'd)

Minimum Minimum Permissible Operable Degree of Bypass No Functional Unit Channels Redundancy Conditions

8. Pressurizer Water 2 1 Not Required in Level (LI-0102) Cold or Refueling Shutdown
9. Pressurizer'Code l per None Not Required Safety Relief Valve Valve Below 325°F Position Indication (Acoustic Monitor or Temperature Indication)
10. Power Operated Relief 1 per None Not Required When Valves (Acoustic Valve PORV Isolation Valve Monitor or Temperature is Closed and its Indication) Indication System is Operable
11. PORV Isolation Valves 1 per None Not Required When Position Indication Valve Reactor is Depressurized and Vented Through a Vent -1.3 sq inch
12. Subcooling Margin 1 None Not Required Monitor Below 515°F
13. Auxiliary Feed Flow 1 per None Not Required Rate Indication Steam Below 325°F Generator
14. Auxiliary Feed Pump 1 per (e) None Not Required Auto Initiation Pump Below 325°F Circuitry
15. Excore Detector None None (e) With one auxiliary feed pump automatic initiation circuit inoperable, in lieu of the requirement of 3.17.2, provide a second licensed operator in the control room within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. With both inoperable, in lieu of following the requirements of 3.17.2, start and maintain in operation the turbine driven auxiliary feed pump.

(f) Calculate the Quadrant Power Tilt using the excore readings at least once per 12.hours when the excore detectors deviation alarms are inoperable.

Amendment No ~7, 68 3-Sla December 8, 1981 TS0884-0001B-LI01-NL04

Table 3.17.4 (Cont'd)

Minimum Minimum Permissible Operable Degree of Bypass No Functional Unit Channels Redundancx: Conditions

16. Containment Pressure 1 None Not Required (PT-1805A and PT-1812A) Below 210°F
17. Containment Sump 1 None Not Required Water Level Below 210°F (LT-0382 and LT-0383)
18. Containment Floor 1 None Not Required Water Level Below 210°F (LE-0446A and LE-0446B)
19. Gaseous Containment 1 None Not Required Monitoring System Below 210°F (RE-1817) (g)
20. Containment Humidity 3 None Not Required Detectors Below 210°F (HT-1812, HT-1813, HT-1814, HT-1815)
21. Containment Air Cooler 3 None Not Required Condensate Level Switches Below 210°F (LS-0817, LS-0865, LS-0868, LS-0870)

(g) Three of the four supply valves (SV-1819, 1820, 1821, and 1822) to RE-1817 must be operable with their associated containment air cooler fan (A or B) in service.

Proposed 3-8lb TS0884-0001B-LI01-NL04

TABLE 4.1.3 Minimum Frequencies for Checks, Calibrations and Testing of Miscellaneous Instrumentation and Controls (Continued)

Surveillance Channel Description Function Frequency Surveillance Method

8. Control Rod Drive System a. Test R a. Verify proper operation of all drive Interlocks control system interlocks, using simulated signals where necessary.
b. Test p b. Same as 8(a) above, if not done within three months.
9. Flux-T Power Comparator a. Calibrate *R a. Use simulated signals.
b. Test M b. Internal test signal.*
10. Calorimetric Instrumentation a. Calibrate(2) R a. Known differential pressure applied to feedwater flow sensors.
11. Containment Building a. Test R a. Expose sensor to high humidity atmosphere.

Humidity Detector b. Check s b. Comparison of channels.

12. Interlocks - Isolation Valves a. Calibrate R a. Known.pressure applied to sensor.

on shutdown Cooling Line

13. Service Water Break Detector a. Test R a. Known differential pressure applied to in Containment Sensors.

(1) During the 1978 refueling outage, Item 2.c will only be performed on 7 rods (1 per bank). The secondary rod position surveillance (Item 3.c) will be performed in entirety. Additionally, a 20" rod position check (comparing primary indication to secondary indication) will be conducted on each rod. If the primary and secondary indications vary more than 2" from each other, corrective action will be taken to restore the proper tolerances.

(2) The 1981 surveillance function may be deferred until the end of the 1981 refueling outage.

4-11 Proposed TSP0585-0203D-NL02

Surveillance

  • Channel Description Function Frequency Surveillance Method
14. Auxiliary Feed Pump a. Check M (5) a. Comparison of Channels Flow Indication b. Calibrate R b. Known Differential Pressure Applied to Sensors "ii
15. Auxiliary Feed Pump a. Test M (3) (5) a. Internal Test Signal ..

Auto Initiation b. Calibrate R b. Known Differential Pressure Applied to Sensors

16. Power Operated Relief Valves

& Pressurizer Code Safety Relief Valves Position Indication

a. Temperature a. Calibrate R a. Known Resistance Substitute for RTD Comparison*
b. Check s of Channels
b. Acoustic Monitor a. Calibrate R a. Injected Calibrated Test Signal
17. Subcooling Margin Monitor a. Check s a. Comparison of Channels
b. Calibrate R b. Known Resistance Substituted for RTD Coincident With Known Pr~ssure Input (4)
18. Containment Pressure Wide a. Check s a. Comparison of Channels Range b. Calibrate R b. Known Pressure Applied to Sensors
19. Containment Sump Water a. Check s a. Comparison of Channels Level Instrument b. Calibrate R b. Known Differential Pressure Applied' to Sensors
20. Containment Floor Water a. Check s a. Comparison of Channels Level Instrument b. Calibrate R b. Known Level Applied to Transducer
21. Containment Air Cooler a. Test R a. Move Float and Verify Control Room Alarm Condensate Level Switches
22. Gaseous Containment Monitor a. Check D a. Normal Readings observed and Internal Test (RE 1817) Signals Used to Verify Instrument Operation
b. Calibrate R b. Exposure to Known External Radiation Source
c. Test M c. Detector Exposed to Remote Operated Radiation Check Source (3)Test method to be alternated to include starting auxiliary feedwhter pump from the control room hand switch, from the breaker and from the automatic start in a three-month period.

(4)In conjunction with Item 4(b), Table 4.1.1.

(5)It is not necessary to perform the specified testing during the cold shutdown condition.

4-lla Proposed TSP0585-0203D-NL02