Responds to Listed Questions Re Fes & Final Addendum to Fes, Per 840808 Request.Forwards Chlorine Minimization Study. Related Info Encl
ML18051B064
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/14/1984
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18051B065 List:
References
NUDOCS 8409210196
Download: ML18051B064 (2)


Text

consumers Power company General Offices: 1945 West Parnall R<lild, Jilck~on, Ml 49201 *.{517) 713a-0550 September 14, 1984

Director, Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - RESPONSE TO ENVIRONMENTAL REVIEW FOR LICENSE CONVERSION NRC letter dated August 8, 1984 r~quested Consumers Power Company to respond to four (4) questions with regards to the Final Environmental Statement (FES) i and Final Addendum to the FES.

Tne questions and Consumers Power Company responses are as follows:

Question 291.1 The NPDES Permit Monitoring Requirement A.9 required the licensee to conduct a study of the free-chlorine component of the total residual chlorine.

Provide a copy of this report and, when available, a copy of the State's review of this* report.

Response

See Attachment 1, letter d~ted August 19, 1981 from R J Courchaine Division Chief, Michigan Department of Natural Resources.

Question 291.2 The NPDES Permit Monitoring Requirement A.10 required the licensee to conduct a chlorine.minimization study to determine the minimum quantity of chlorine n~cessary to prevent biofouling the cooling system.

Provide a copy of this report and, when available, a copy of the State's review of this report.

Response

See Attachment 2 dated August 14; 1984 "Chlorine Minimization Final Report".

Question 291.3 Specify the changes in intake volume from the lake as a result of elimination of dilution pumping.

1-

. :.,840.9.2AD1g~~60~686~~5_.: * *\\

PDR*

OC0984-0004-NL02

. D

Director, NRR Palisades Plant RESPONSE TO ENVIRON REVIEW fOR LICENSE CONVERSION September 14, 1984

Response

2 Dilution pumping has not been eliminated at Palisades and has in fact been maximized, therefore intake volume from the lake has not decreased.

Question 291.4 In the 1978 final addendum to the Palisades FES Section 10.1.5.4 the staff recommended that the applicant inspect for leakage in the water distribution channels and all other sources of additional drift and larger drops (of water) and report to the staff all repairs undertaken to correct leaks in the water distribution system and all other sources of additional drift. Please provide the results of these inspections and repairs.

Response

The recommended inspection of the Palisades cooling towers was performed and has been repeated during each refueling outage since 1978.

As a result of these inspections, repairs have been completed on approximately eight cells.

The need for additional repairs has been identified, and the repairs will be completed during the next (Cycle 7) refueling outage.

Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades Attachments OC0984-0004-NL02