consumers Power company General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 August 9, 1984 Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - SUPPLEMENT 1 TO NUREG-0737 - SAFETY PARAMETER DISPLAY SYSTEM
- PRELIMINARY SAFETY ANALYSIS REPORT AND IMPLEMENTATION SCHEDULE, REGULATORY GUIDE 1.97 VARIABLES AVAILABLE AT EMERGENCY RESPONSE FACILITIES -
CORRECTED COVER LETTER AND ATTACHMENT 1 The purpose of this submittal is to make editorial changes to the cover letter and Attachment 1 of the July 31, 1984 submittal.
Accordingly, the cover letter and Attachment 1 of the July 31, 1984 submittal are reprinted below in their entirety and replace the corresponding sections of the previous letter.
Corrections are indicated by a bar in the right hand margin.
Supplement 1 to NUREG-0737, December 17, 1983 provides, in part, NRC guidance for completion of Safety Parameter Display System (SPDS) and Regulatory Guide 1.97 Projects.
The purpose of our July 31, 1984 submittal was to fulfill commitments associated with each project as stated in Consumers Power Company submittals dated September 16, 1983 and September 13, 1983.
Safety Parameter Display System In accordance with Supplement 1 to NUREG-0737, the SPDS will provide a concise display of critical plant variables to the control room operators to aid them in rapidly and reliably determining the safety status of the plant. The SPDS display augments the Critical Function Monitoring System (CFMS). The SPDS and CFMS are complimentary systems.
Each is described in Attachment 2.
With the exception of a dedicated display in the control room, the SPDS will be fully operational and operators trained by December 1985.
The capability will exist, by December 1985, to display SPDS parameters in the control room through a CRT which is not dedicated to display of SPDS parameters (the CRT will be shared with the CFMS).
A CRT dedicated to the display of SPDS para-meters will be added to the control room before startup from the next refuel-ing outage.
',--------8408140295 840809 PDR ADOCK 05000255 F
PDR floo.3
'/'
OC0684-0020A-NL02
DMCrutchfield, Chief Palisades Plant
- SUPPLEMENT 1 TO NUREG-0737 August 9, 1984 Regulatory Guide 1.97 2
Consumers Power Company's submittal dated September 13, 1983 committed to provide a detailed list of CFMS variables which will be available by data-link to the Technical Support Center, Emergency Operations Facility and General Office Control Center.
This commitment was made in response to Sections 6.1.c and 6.1.d of Supplement 1 to NUREG-0737 to fulfill the need of making appropriate Regulatory Guide 1.97 variables available to appropriate Emergency Response Facilities.
Appendix C of Attachment 2 of our July 31, 1984 submittal provides the list of variables. CFMS variables will be available by May 1985.
This schedule is consistent with the operability and turnover of CFMS to the Plant Operations Department. Consumers Power Company submittal dated September 16, 1983 provides additional response regarding Regulatory Guide 1.97.
In summary, the CFMS is considered an enhancement to the Emergency Response Facilities.
Conclusion of this submittal provides a summary of Milestone Commitments on Supplement 1 to NUREG - 0737.
The Attachment was last submitted July 31, 1984 and is revised to reflect an SPDS completion date consistent with the cover letter.
Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment OC0684-0020B-NL02
ATTACHMENT 1 Consumers Power Company Palisades Plant - Docket 50-255 MILESTONE CO:MMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 REVISION 4 August 9, 1984 3 Pages MI0684-0018A-NL02
Revision Number 0
1 2
3 4
~
Consumers Power Company Palisades Plant MILESTONE COMMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 REVISION
SUMMARY
Consumers Power Company Submittal September 16, 1983 April 2, 1984 June 29, 1984 July 31, 1984 August 9, 1984 REVISION
SUMMARY
Original Submittal Modify Emergency Operating Procedure and Detailed Control Room Design Review schedules to accomodate increased scope for function and task analysis.
The increased scope addresses NRC letters of February 29, 1984 and May 16, 1984.
a)
Revise wording to be consistent with NRC Confirmatory Order dated June 12, 1984 b)
Document EOP Procedure Generation Package submittal c)
Provide EOP implementation schedule d)
Provide date for DCRDR report and implementation schedule e)
Revise Regulatory Guide 1.97 commitment dates to accomodate increased scope of function and task analysis and a resequencing of activities a)
Document SPDS safety analysis report submittal b)
Provide implementation schedule for SPDS fully operational and operators trained Editorial Change.
Revise SPDS implementation schedule (item lb) to be consistent with schedule proposed in July 31, 1984 cover letter.
MI0684-0018B-NL02
CONSUMERS POWER COMPANY PALISADES PLANT MILESTONE COMMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 REVISION 4 TITLE
- 1.
Safety Parameter Display System (SPDS)
- 2.
Detailed Control Room Design Review (DCRDR)
- 3.
Application to Emergency Response Facilities MI0684-0018B-NL02 la.
lb.
2a.
2b.
3a.
3b.
AUGUST 9, 1984 REQUIREMENT Submit a safety analysis and an implementation plan to the NRC.
SPDS fully operational and operators trained.
Submit a program plan to the NRC.
Submit a summary report to the NRC including a proposed schedule for implementation, COMPLETION SCHEDULE (Or Status)
Complete (Consumers Power Company letter dated July 31, 1984)
December 1985 Complete (Consumers Power Company letters dated March 16, 1982 & June 7, 1983.)
May 1985 Submit a report to the NRC May 1986 describing how the require-ments of Supplement 1 to NUREG-0737 have been or will be met.
Implement (installation or upgrade) requirements.
Plan and schedule to be provided with report in May 1986
CONSUMERS POWER COMPANY PALISADES PLANT MILESTONE COMMITMENTS ON SUPPLEMENT 1 TO NUREG-0737 REVISION 4 TITLE
- 4.
Upgrade Emergency Operating Procedures (EOPs)
- 5.
Emergency Response Facilities 4a.
4b.
5a.
5b.
5c.
AUGUST 9, 1984 REQUIREMENT Submit a Procedures Generation Package to the NRC.
Implement the upgraded EOPs.
Technical Support Center full functional.
Operational Support Center fully functional.
Emergency Operations Facility fully functional.
COMPLETION SCHEDULE (Or Status)
Complete (Consumers Power Company letter June 29, 1984)
February 1986 Complete*
Complete*
Complete*
Except for any additional changes that may be required as a result of the other items in this order.
MI0684-0018B-NL02 I