ML18051A663
| ML18051A663 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/02/1983 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18051A662 | List: |
| References | |
| NUDOCS 8311080366 | |
| Download: ML18051A663 (2) | |
Text
- .
e*
CONSUMERS POWER COMPANY DOCKET 50-255 - LICENSE DPR PALISADES PLANT REQUEST FOR CHANGE TO PROVISIONAL OPERATING LICENSE For the reasons hereinafter set forth, it is requested that the Provisional 0-perating License DPR-20, Docket 50-255, issued to ConsumP.r.s Power Co:rrtpP..ny nr>.
October 16, 1972, for the Palisades Plant be changed as described in Section I below:
I. CHANGES A.
Delete the following requirements set forth by the November 9, 1979 Order for Modification of License; ie, items A, B and C of Section IV of Appendix C:
"A.
Prior to startup following the present refueling the licensee shall conduct a comprehensive review of all procedures and check lists to assure that:
11 (1) all valves and other controls for engineered safety features have been identified in such procedures and check lists;
"(2) such procedures and check lists require that all such valves and other controls are in their proper position prior to startup after any cold shutdown; and 11 (3) such procedures and check lists require that after test-ing, maintenance or other activities which involve manipu-*
lating such valves and other controls, the valves and other controls have been returned to their proper position for operation.
"B.
Report to the Director of the NRC's Region III office the results of at least monthly inspections during operation of all accessible valves and other controls for engineered safety systems for compliance with the Limiting Condition for Opera-tion (LCO) requirements of the Technical Specifications.
"C.
Prior to startup following the present refueling, the licensee shall explain to the Director, NRC Office of Inspection and Enforcement, in a meeting in Bethesda, Maryland, how the above requirements shall be implemented."
031100036~ 831102 PDR ADOCK 05000255 P
PDR OC0983-0001C-NL02
2 II.
DISCUSSION The above proposed Provisional Operating License Changes are requested due to the following reasons:
Tasks A and C of the November 9, 1979 Order were completed prior to start-up from the 1979 refueling outage.
Task B, since it is a monthly requirement, is currently ongoing.
Consumers Power Company will continue the monthly surveillance of all accessible valves and controls for engineered safety features.
- However, the monthly -reporting is an-unnecessary function since any noncompliance discovered must be reported to the NRC in accordance wi_th the Palisades Technical Specifications.
III.
CONCLUSION The Palisades Plan~ Review Connnittee has reviewed this proposed Provi-sional Operating License change request and has determined that*this change does not involve an unreviewed safety question and therefore involves no significant hazards consideration.
This change has also been reviewed under the cognizance of the Nuclear Safety Board.
CONSUMERS POWER COMPANY By
\\
R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me this 2nd day of November 1983.
ey, Notary Pu County, Michigan My connnission expires November 5, 1986.
SHERRY LYNN CURFEY Notary Public, Jackson County, ~ici.
My Commi~ion Expires Nov. 5, 1986 OC0983-0001C-NL02