UNITED STATES
N.AR REGULATORY COMMISSION
REGION Ill
Docket No. 50-255
Consumers Power Company
ATTN:
Mr. R. B. DeWitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI
49201
Gentlemen:
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 601 J7
........
-rn v ,~TOJ5B3 1+
. KECEBVtl:D
SEP 1 Z 1983
NUCLEAR LICENSING
We have completed our review of your revised Emergency Plan dated July 29,
1983.
Enclosed is a Safety Evaluation Report No. 50-255/83-12 with the NRC
staff conclusions.
Our review indicated that your plan meets the planning
standards of 10 CFR 50.47(b) and the requirements of Appen~ix E to 10 CFR
Part 50 except for the unresolved issue of the use of a temporary EOF.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes
to your plan which may decrease the effectiveness of the plans.
Ho~ever,
i~ your review indicates no decrease in emergency preparedness, then changes
can be made without NRC approval.
In all cases, you shou1rl. furnish copies
of each proposed change to the NRC in accordance with 10 CfR 50.54(q).
Any changes to the Emergency Plan Implementing Procedures should be made in
accordance with the requirements of 10 CFR Part 50, Appendi~ E,Section V
(Implementing Procedures).
The Federal Emergency Management Agency (FEHA) provided final findings on
the status of offsite preparedness in the enclosed letter dated July 2, 1982.
FEMA states that the plans and preparedness for offsite protection hear the
Palisades Nuclear Power Plant are adequate to protect the health and safety
of the public and that there is reasonable assurance that the appropriate
protection measures can and will be applied offsite in the event of a radio-
logical emergenc~.
In accordance with 10 CFR 2._790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the re-
quir.ements of 2. 790(b) (1). If we do not hear from you in this regard within
' .
-.
'
Consumers Power Company
2
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
If we do not
hear from you in this regard within the specified periods noted above, a copy
of this letter and the enclosed inspection report will be placed in the Public
Document Room.
Your cooperation with us is appreciated.
'.
Enclosures:
1.
FEMA ltr dtd 7/2/82
2.
Safety Evaluation
.
Report No. 50-255/83-12(DRMSP)
cc w/encls:
~D. J. VandeWalle, Nuclear
Licensing Administrator
R. W. Montross, Manager
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen~ Michigan
Public Service Commission
F. G. Pagano, DEP/OIE
D. Bement, FEMA, Region V
T. Wambach, ORBS, NRR
Sincerely,
(}: ~ . Pc,,p_,~~ ~
C. g_ Paper~ello, Chief
Radiological Safety Branch
.. '
..