Forwards Action Plan & Schedule to Resolve SEP Topic III-7.B, Design Codes,Design Criteria & Load Combinations. Action Plan Will Be Completed & Summary Rept Submitted by 830826
ML18051A324
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/28/1983
From: Toner K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-03-07.B, TASK-3-7.B, TASK-RR NUDOCS 8303070035
Download: ML18051A324 (5)


Text

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (5171 788-0550 February 28, 1983 Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - SEP TOPIC III-7.B, "DESIGN CODES, DESIGN CRITERIA AND LOAD COMBINATIONS" - ACTION PLAN AND SCHEDULE TO RESOLVE REMAINING OPEN ITEM By letter dated January 12, 1983 Consumers Power Company committed to resolve one remaining open item on SEP Topic III-7.B "Design Codes, Design Criteria and Load Combinations", for the Palisades Plant.

The remaining open item pertains to demonstrating that the steel embedments meet the requirements of the American Concrete Inst'itute Standard ACI-349-80, Appendix B.

This letter provides the NRC staff, with an action plan to complete the open item and a schedule to satisfy our January 12, 1983 commitment.

Since the work effort associated with this open item is more extensive than originally estimated, Consumers Power Company is unable to resolve the open item at this time.

However, we have attached an action plan for closing the remaining open item.

The action plan will be completed and a summary report will be submitted by August 26, 1983.

The summary report will be written as an Addendum to our letter dated October 8, 1982.

Kerry A Toner Senior Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment 8303070035-- 830228 ___ --~---

PDR ADOCK 05000255' P

PDR OC0283-0022A-NL02

Consumers Power Company Palisades Plant Docket 50-255 - License DPR-20 ACTION PLAN TO RESOLVE PALIADES SEP TOPIC III-7.B CODE ITEM ACI 349-80 APPENDIX B 3 Pages MI0283-0012A-NL02

e ACl!ON PLAN TO RESOLVE PALISADES SEP TOPIC III-7.B CODE ITEM AC! 349-80 APPENDIX B Sheet 1 of 3 Establish Library Of Design Criteria Documents* Pertaining To Paliades Embedments Identify Requirement Of ACI-349-80 Appendix B YES NO e)H. 2 NO YES ~~~~~~~~~-~

NO FOOTNOTE YES Categorize Results & Report Findings J

I END

  • CODES, INDUSTRY STANDARDS, VENDOR DESIGN RECOMMENDATIONS AND OR DESIGN SPECIFICATIONS APPLICABLE TO PALISADES EMBEDMENT DESIGN(S).

MI0283-0012A-NL02 SH.2

SH.l e

e ACTION PLAN TO RESOLVE PALISADES SEP TOPIC III-7.B CODE ITEM ACI 349-80 APPENDIX B Sheet 2 of 3 Obtain As-Built Drawings YES ~

Select Worst Case(s)

Define Weakest Link In Load Path & Estimate Yield Load.Compare This Yield Load With Concrete Capacity NO From Weakest Link, Estimate Maximum Allowable Load (By Design).

Compare With Concrete Capacity NO YES NO Yµ;s SH.1 YES NO

  • ------------*[Q>

FOOTNOTE Sl'I.:3 CRITERIA TO BE.DEVELOPED AND REPORTED.

MI0283-0012A-NL02

c SH.

k Estimate Load

.L - --

FOOTNOTE AaN PLAN TO RESOLVE PALISADES e SEP TOPIC III-7.B CODE ITEM ACI 349-80 APPENDIX B Sheet 3 of 3 Further Action (Undefined At This Time) 1 Research Record For Actual Load NO

__. __ J Action To Be Determined And Reported YES

    • CRITERIA TO BE DEVELOPED AND REPORTED MI0283-0012A-NL02 i

SH.1 1

J

_,