consumers Power company

\\

General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (517) 788-0550 January 12, 1983 Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commisssion Washington, DC 20555 DOCKET 50-255 - LICENSE DPR

  • PALISADES PLANT -

SEP TOPIC III-7.B, "DESIGN CODES, DESIGN CRITERIA AND LOAD COMBINATIONS" -

ACTION PLAN AND SCHEDULE TO ADDRESS ONE REMAINING OPEN ITEM By letter dated October 8, 1982, Consumers Power Company committed to provide the NRC with an action plan and schedule to resolve one remaining open item pertaining to SEP Topic III-7.B, "Design Codes, Design Criteria and Load Combinations" for the Palisades Plant.

Consumers Power Company has reviewed this open item on steel embedments and will conduct extensive re-evaluations using available engineering documents.

It is expected that this work will be completed and submitted to the NRC by February 28, 1983.

Consumers Power Company would like to take this opportunity to make a correction to our October 8, 1982 submittal.

In that submittal, we indicated in item C-8, page 8 of the attachment to the letter, that "No precast concrete structural elements were used as part of any safety-related structures.

Therefore, this provision does not apply to the Palisades Plant."

Consumers Power Company has determined that this response is inappropriate, and would like, therefore, to revise it to state as follows:

"At the Palisades Plant, there are limited structural elements that are subjected to direct shear.

A sample evaluation of such a bracket to ACl 349-80, section 11.7, shows that there is adequate reinforcement."

8301170398 830112 PDR ADOCK 05000255 p

PDR OC0183-0003A-NL02

1,..*,

D~"crutchf ield, Chief Palisades Plant SEP Topic III-7.B January 12, 1983 I '-. *

.Consumers Power Company appreciates the NRC staff's understanding on this matter and regrets any inconveniences that the above error might have caused.

Kerry A Toner Senior Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades OC0183-0003A-NL02