Application for Amend to License DPR-20,proposing Tech Spec Changes to Provide Limiting Conditions for Operation & Surveillance Requirements for Primary Coolant Gas Vent Sys. Class III Amend Fee Encl
ML18047A545
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/30/1982
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18047A546 List:
References
NUDOCS 8209020434
Download: ML18047A545 (3)


Text

...

consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 August 30, 1982 Dennis M Crutchfield, Chief Operating Reactors Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR David J VandeWalle Nuclear Licensing Administrator PALISADES PLANT - PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST -

PRIMARY COOLANT SYSTEM (PCS) GAS VENT SYSTEM Attached are three (3) originals and thirty-seven (37) conformed copies of a Request for Change to the Palisades Technical Specifications.

The proposed changes provide limiting conditions for operation and surveillance requirements for the Primary Coolant Gas Vent System.

The proposed changes involve a single safety issue.

Therefore, a check in the amount of $4,000.00 is attached pursuant to 10 CFR 170.22, Class III change.

Nuclear Licensing Administrator CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades

,~-"Rs~2orii9iS-.0~2ito~41-:34,,.-;;;:82

-
0
8~3
-:0

=---~---,..,.' ~

1

~\\

PDR ADOCK 0500025S p

PDR I I L_i_

CONSUMERS POWER COMPANY Docket 50-255 Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below:

I.

Changes:

A.

Add Section 3.1.9 B.

Add Item 13 to Table 4.2.2 to read as follows:

"13.* Primary Coolant Gas Vent System At least one vent path from the reactor vessel and pressurizer to containment shall be demonstrated operable:

1.

Prior to startup and at least once every 31 days by verifying emergency power is available.

2.

At least once every refueling cycle by verifying each power operated valve can be positioned from the control room and each manual valve is in its correct position."

NOTE:

Revised Technical Specification pages are attached.

Proposed changes are shown by a vertical line in the right hand margin.

II. Discussion The above proposed Technical Specifications changes are requested in order to *comply with the Technical Specification requirement of NUREG-0737, Item II.B.l.

These changes provide limiting conditions for operation and surveillance requirements for the

  • Primary Coolant Gas Vent System.. It should be noted that the addition of Item 13 to Table 4.2.2 is correct due to the renumbering of this table as was proposed by Technical sp*ecification change request submitted by Consumers Power Company on August 30, 1982, entitled "Engineered Safety Feature Filtration System."

DMCrutchfield, Chief Palisades Pla.rit Technicai Spedfication Change Request -

August 30, 1982 III.

Conclusion Based on the foregoing, both the Palisades Plant Review Committee and the Safety and Audit Review Board have reviewed these changes and find them acceptable.

CONSUMERS POWER COMPANY BY R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me.this 30th day of August

<;ZibJ~~~~

Helen I Dempski, ~~lie Jackson County, Michigan My :coifuniSsion* ~xpires December 14, 1983.

~*.

1982.

2