Informs That TMI Action Items I.A.1.3,shift manning,I.C.5, Procedure for Feedback of Operating Experience & I.C.6, Procedure for Verifying Correct Performance,Resolved
ML18046B334
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/02/1982
From: Wambach T
Office of Nuclear Reactor Regulation
To: Vandelwalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TASK-1.A.1.3, TASK-1.C.5, TASK-1.C.6, TASK-TM LSO5-82-03-010, LSO5-82-3-10, NUDOCS 8203080023
Download: ML18046B334 (3)


Text

~-.

tit UNITED STAT-ES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20S55 Docket No. 50-255 LS05-82-03-0l 0 Mr. David VandeWalle Nuclear Licensing Administrator Consumers Power Company 1 945 West Pa rna ll Road Jackson, Michigan 49201

Dear Mr. VandeWalle:

March 2, *1982

SUBJECT:

TMI ACTION PLAN ITEMS I.A.l.3, I.C.5 AND I.C.6 AS DESCRIBED IN NUREG-0737 - PALISADES PLANT We have completed our review of the Consumers Power Company referenced TMI Action Plan items for the Palisades Plant.

Our conclusions on each item are as follows:

Item No. I.A.l.3 Shift Manning By letter dated December 19, 1980, you provided your response to the shift manning requirements of NUREG-0737.

In this response, you stated that you are in compliance with the required manning level and that you intend to have a second SRO on shi*ft by July 1, 1982.

It was al so stated, however, that several problems could prevent strict compliance w.ith the overtime requirements (especially bargaining a*greement conditions),

thus precluding a*full commitment, but you would attempt to follow these overtime recommendations as closely as possible.

The staff has verified that you are in compliance with the required manning level, and that your intention to place a s~cond SRO on shift by July 1, 1982, is acceptable.

An NRC Confirmatory Order dated March 9, 1981

  • addressed, among other things, overtime limits for licensed *operators which are in conformance with th~ restrictions of the Ju~y 31, 1980 letter.

The employees union has requested a hearing on this provision of the

,.0 1 March 9*, l981 order.

Your compliance has been verified by the sta~f.

.$Cs The staff finds your activities_ and commitments on this item ac~eptable.

Item No. I.C.5 Procedure for Feedback of Operating Experience to Plant l>.S~,,.se(,,.,)

Staff Based on discussions with your management, review of Palisades procedure

'EM-03 and letter dated December 19, 1980, the staff has determined that you have committed to and have implemented a program for feedback of operational experie*nce to plant staff.

We conclude that the program is acceptable~

. /:*

~

Mr*. David VandeWalle March 2, 1982 Item*No. I.C.6 Guidance on Procedures for Verifying Correct Perfonnance of Operating Activities You have provided the necessary control measures to satisfy this require-ment, using a combination of automatic*status monitoring~ procedural*

directives for independent human verification, and system or component tes~ing programs.

In accordance -with other NRC directives (Orders dated

  • November 9, 1979 and March 9, 1981) you have performed two procedure review and revision programs addressing verification of correct*activity perfonnance and have implemented a separate monthly surveillance* of valves, switches, and other controls important to safety. These activities have been reviewed by staff and found acceptable.

Further, you have identified and are pursuing selected augmentation of automatic status.monitoring capability.

The staff finds your status on this matter acceptable.

Based on *the above, we find your program at the Pali sades Pl ant to be a*cceptable.

Based on the results of.our review, TMI Action Plan Items Nos. I.A.l.3, I.C.5 and I.C.6 are considered resolved.

cc:

See next page Sincerely, L 1J1. II H.Ll,I Thomas V. Wamb~~~nager Operating Reactors Branch #5 Division of Licensing DISTRIBUTION Docket OI&E NRC PDR Local PDR ORB Reading NSIC DCrutchfield HSmith TWambach WRoss MGrotenhuis RLicciardo OELD ACRS (lb)

SEPB

-~~.=... Q.~.~... ~\\.. '..~.~.:... 9.~.~... ~L... P.~.:... 9.lW... #.1. ** Q.~.*.

.~.....

vJRos M~ t b.'.

~

A~

D

  • * * * * * *
  • i :~v.r:.Q..e.u. u.1.s.

1.c.c.1.a.r.1.UJ...

. a.1 d *

... ~...f.o/J~:..... "'i]1.r:i~Y.... ;...

.iAfF..~.. ;f!...... 7:.'1... f.?......

OFFICE. ~~.=... ~.~~***~*~****.~.~--=1t.J%...

SURNAME. f!r.~P.~S~.~.. T.~'7.ii°~g;:z:*

DATE *****

  • cli... **.~*..... :....Z.~.... lL....

NRG FORM 318 (10-80) NRCM 0240.

OFFICIAL R~CORD COPY

\\

                                      • ~****

USGPO: 1981-335-960

Mr. David J. VandeWalle cc M. I. Miller, Esquire Isham, Lincoln & Beale Suite 4200 One First National Plaza Chicago, Illinois

~0670 e*.

Mr. Paul A. Perry, Secretary Consumers Power Company 212 W~st Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Myron M. Cherry, Esquire

. Suite 4501 One IBM Plaza Chicago, Illinois 60611 Ms *. Mary P. Sinclair Great Lakes Energy A 11 i anc*e 5711 Summerset Drive Mid1and, Michig0;n 48640 Kalamazoo Public Library 315 South Rose Street Kalamazoo, Michigan 49006 Township Supervisor Covert Townshi Route 1, Box 10 Van Buren County,*Michigan 49043 Office of.the Governor (2)

Room l - Capitol Building Lansing, Michigan 48913 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 Palisades Plant ATTN:

Mr. Robert Montross Plant Manager

3. -

March 2, 1982 U. S. Environmental Protection Agency Federal Activities Branch Region V Office

.ATTN:

Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 Charles Bechhoefer, Esq., Chairman Atomic S~fety and Licensing Board' Panel U. s. Nuclear Regulatory Commission Washington, D. C.

205.S5 Dr. George C. Anderson Department of Oceanography University of WashingtOn Seattle, Washington 98195 Dr. M. Stanley Livingston 1005 Calle Largo Santa Fe, New M~xico 87501 Resident Inspector c/ o. U. S. NRC Pali sades Pl ant Route 2, P. O. Box 155 Covert, Michigan 49041 James G. Keppler, Regional Administrator Nuc.lear Regulatory Commission, Region III Office of Inspection and Enforcement 799 Roosevelt Road