Denies 750911 Request for Exemption to 10CFR50 App J Section III.D.2,removing Requirement That Personnel Air Lock Be Tested After Each Use.Modified Tech Specs Required within 90 Days to Require Full Type B Test of Airlock
ML18046B178
Person / Time
Site: Palisades 
Issue date: 12/11/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
LSO5-81-12-034, LSO5-81-12-34, NUDOCS 8112290559
Download: ML18046B178 (3)


Text

I I

I I

I UNITED STATES NUC~AR REGULATORY COMMISSION WASHINGTON, D. C. 20555 becember 11, 1981 Docket No. 50-255 LS05-81-12-034

'Mr. David P. Hoffman Nu cl ear Licensing Admi ni s*trator Consumers Power Compa_ny 1945.W. Parnall Road Jackson, Michigan

  • 49201

Dear Mr. Hoffman:

By 1 ett.er dated *september 11, 1975, you requested an exemption to*

10 CFR 50, Appendix J, Section III.D.2:

T~e exemption would remove the requirement that the _personnel air lock be tested After each opening.*

We have reviewed the.information *you provided.March 2,_ 1976 an.d September 27, 1976 and do not find a sufficient basis* to accept your a1rlock testing as you have proposed. *However, Paragraph I'TI.D-.2 of Appendix J to 10 CFR 50 was revised October 22, 1980.to allow leakage te~tihg of air. locks at least once every 3 days* during periods of frequent usage and to permit such testing to be.. performed at a

  • pressure lower than the accident pressure {PA), if so specified in the plants Technical Specifications.

The revision to Paragraph III.D.2 also permits airlocks with dual seals to be tested at the times of frequent usage by pressurizing between the.seals, thereby el.iminating the need to pressurize the entire air lock.

Full air l~ck door s~altng tests which occur every ~ months at PA ar~ not affected by the revised Appendix J.

In addition, a requiremerit was added to retest, prior to returning the reactor*to an operating mode requiring containment integrity, penetrations which have been opened.following a Type A or B*test.

Based on our review of the information the following conclusions are made regarding the proposal for the. Palisades Plant:*

1)

. 2)

Your* request for exemption from the requirements for airlock leak testing if the airlock is opened between the six-month Type B test, is denied.

Your Technical Specifications *should be modified to re.quire a full Type B test of the personnel airlock at a pressure of Pa at least once every *six months, with a verification of airlock door seal integrity within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of each opening or the first of a series of openings during the interim between six month tests, whenever.

containment integrity is required.

In the event that the testing j;

Mr. David December 11, l 981 for this 3-day interval cannot be at Pa, the test pressure will be as stated in the Technical Specifications.* The acceptance criteria for air lock testing, taking into account extrapolation to Pa if performed at reduced pressure, shall be stated in the Technical Specifications.

We hequest that you submit the required Technical Specification modifi-cations within 90 days.

cc: See next page DISTRIBUTION Docket NRC PDR Local PDR ORB Reading NSIC DRRutchfield HSmith TWAmbach OELD 0 I &E ( 3)

ACRS (10)

SEPB Sincerely, Original signed by Thomas V. Wambach for/

Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing OffOC<~ *~r.:~~**.°.~~i"d :-f.~!::!*~;* ************************ ************************

SUR::::; j~/i~l!.T" :.:t.i:/i(/..l[ :1~f.\\~~iw.*:::::: :::::::::::::::::::::::: ::::::::::::::::::::::::

NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960

i I I.

I

....Af.

Mr *. David P. Hoffman cc M. I. Miller, Esquire.

Isham, Lfncoln &*Beale Suite 4200 One First National Pla~a Chicago, Illinois 60670 Mr. Paul A. Perry, Secretary Consumers* Power *company' 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West.Michigan Avenue Jackson, Michigan 49201 Myron M. Cherry, Esquire Suite 4501

  • One IBM Plaza" Chicago, Illinois 60611 Ms. Mary P.* Sinclair

.Great Lakes Energy* Alliance 5711 Summerset* Ori ve Midland, Michigan 48640 Kalamazoo Public Library 315. South Rose Street Kalamazoo, Michigan 49006.

.Township Supervisor Covert Township Route l, Box lo*

  • van* Buren County, Michigan Office of the.Governor (2)

Room 1 - Capitol auilding Lansing,.Michigan 48913 William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103 Palisades Plant ATTN:

Mr. Robert Montross Plant Manager Covert, Michig~n 49043 49043 *December l l, J 981

  • U. S *. Environmental Protection*--~

Agency Federal* Activities Branch

-Region V.Office ATTN:

Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 6Q604 Charles Bechhoefer, Esq., Chairman Atomic Safety and Licensing Board Panel

u. S. Nuclear Regulatory Co11111ission Washington, D~. c. 20555.

Dr. George c. Anderson Department of Oceanography University of Washington*.

Seattle,. Washington 98195 Dr. M. Stanley Livingston 1005 Call~ Largo Santa Fe, New Mexico 87501 Resident Inspector c/o.U. S. NRC

  • Palisades Plant Route 2, P. Q. Box 155 Covert~ Mi chi g.an 49043

/