ML18046B011

From kanterella
Jump to navigation Jump to search
Forwards Eds Nuclear Procedure (0540-001-02 & 0540-001-003), in Response to Questions Raised at 810917 Meeting Re SEP Topic III-5.A, Effects of Pipe Breaks on Sys,Structures & Components Inside Containment.
Date released: 10/31/2018 Download: ML18046B011


Operation Procedure 0540-001-03,Revision 2, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Evaluating Structural Response of Piping Targets to Pipe Rupture Loadings.
ML18046B013
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/06/1980
From: Abeles J, Degrossi G, Guzj D
EDS NUCLEAR, INC.
To:
References
Download: ML18046B013 (16)
Operation Procedure 0540-001-02 Revision 1, Palisades Nuclear Station-High Energy Line Break Evaluation Phase III, Procedures for Determining Jet Impingement Forces & Pipe Whip Energies.
ML18046B012
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/15/1980
From: Abeles J, Degrossi G, Guzj D
EDS NUCLEAR, INC.
To:
References
Download: ML18046B012 (31)
Forwards Eds Nuclear Procedure (0540-001-02 & 0540-001-003), in Response to Questions Raised at 810917 Meeting Re SEP Topic III-5.A, Effects of Pipe Breaks on Sys,Structures & Components Inside Containment.
ML18046B009
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/26/1981
From: Vincent R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: CRUTCHFIELD D
Office of Nuclear Reactor Regulation
References
TASK-03-05.A, TASK-3-5.A, TASK-RR
Download: ML18046B009 (1)