ML18046A788

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-255/81-09 on 810503-09,11,18-22 & 26-29.No Noncompliance Noted
ML18046A788
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/19/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18046A789 List:
References
NUDOCS 8107140569
Download: ML18046A788 (2)


See also: IR 05000255/1981009

Text

~ '

..:. -

~

--

UNITED STATES

NUCLEAR REGULATORY COMMISSION

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

June 19, 1981

This refers to the routine safety inspection conducted by Messrs.

B. 1. Jorgensen and J. K. Heller of this office during May, 1981, of

activities at the Palisades Nuclear Generating Plant authorized by NRC

Provisional Operating License No. DPR-20 and to the discussion of our

findings with Mr. R. W. Montross and others of your staff at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you or your contractors believe to be exempt from disclosure under 10 CFR

9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

Section 2.790(b)(l) requires that any such

'.f

'

I ' r

Consumers Power Company

- 2 -

application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it

is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

IE Inspection

Report No. 50-255/81-09

cc w/encl:

D. P. Hoffman, Nuclear

Licensing Administrator

R. W. Montross, Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

,.

~

RIII

jli~

RIII

Jorgensen/so

Boyd

6/17/81

Sincerely,

R. F. Heishman, Acting Director

Division of Resident and Project

Inspection

RII{f!_lK

RI!

Knop

Hei hm([

~\\ 1 '