EN-81-020:on 810612,notice of Violation Will Be Issued to Util Re Alleged Violations Associated W/Isolation of Station Batteries During Plant Operation on 810106
ML18046A722
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/05/1981
From: Riesland J, Thomspon D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
EN-81-020, EN-81-20, NUDOCS 8106180075
Download: ML18046A722 (4)


Text

~

OFFICE OF. IN'S-PE CTI ON AND ENFORCEMENT NOTIFICATION. OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

Consumers.Pdwer Company, Jackson, Michigan (Pali sades)

Docket No.* 50.-255

Subject:

NOTICE OF VIOLATION.*.

'\\.

'..,~

This is to inform the Commission that a Notice of Violation will be iss.ue-ff :tb

  • Consumers Power* Company on or about June 12:. 1981 w.

This action* is based on*

alleged violatiops associated with isolation of the station batteries during.

  • plant operatfon on January 6, 1981.

The violations.include:

  • 1) Failure to
  • .implement. appf".opriate procedures and 2) Inadequate administrative procedures.
  • The violations initia.ted an.Immediate Action Letter' issued January 9, 1981. and an ensuing March 9, 1981 Order Confirming Licensee Actions to Upgrade Facility.

Performance.

Imposition of a civil penalty was also* considered for this matter.

The* Interim Enforcement Policy, (45 FR 66754, October 7, 1980) allows: Orders.

and/or civil penalties to be issued for violations..

  • The staff is establishing a practice not to issue Confirmatory Orders and civil penalties for the same
  • vi.ola.Uon unless* the actions can be taken within a reasonably short period of.

time;* the period we intend t~ µse as a guide is one encompassing ten worki~g

  • days.

In this case,. the regional recommendation for civil penalties was submitted 19 working days after issuance of the Confirmatory Order, but more time passed be.fore the matter came to the* speci fiC. attention of the. OffiCe Di rect9r.

For tliis reason and because a civ11 penalty would be.solely punitive because it

. would not result. in corrective actions beyond those already taken or planned in response to the Order, the decision was made to not assess a* civil penalty for thi.s event.

The deterrent effect of a civil penalty Con otlier licensees)

    • was considered but we con.cluded*that civil penalty-action would not have such

. an additional substantive impact for this case at this time~

A regiona_l Notice of Violation will be issued identifying: 1) *the battery

. isolation event as a Severity Level *nr violation, 2) failure to implement procedures as a Severity Level V violation, and 3) inadequate procedures as a Severity Level VI violation.

It.~hould be rioted that the licensee has not been specifically informed of the enforcement action.

With respect to violation l) above, inspection verified

  • that corrective actions had been.taken.

F'or vio.l at ions 2) and* 3), above, the licensee is required to respond within 30 days concerning nis corrective actions.

Follo\\'iing NRC staff evaluation of the response~ further enforcement actio.n may be considered, based Oi'l the adequacy Ofthe response.

Contact:

J.

I~. Riesland, IE 24939.

D. Tho~~~on, IE 24909 Distribution:

Transmitted H St. /.'db Chairman.Hendrie Commissioner. Ahearne Commissioner Gil insky S. J.: Chilk, SECY Commissioner Bradford ACRS C. C. Kammerer, CA Acting Director, PE

. (For Distribution) toritinue~ on Page 2

__ : __ s1.061s 075

~*

I I, -

I 1*..

I I

I-.

i I -

,Page_2

  • Distributibn-Continued MNBB:.* /J.' '(0 *.
    • W. J. Di rc~s,_ EDO -

c~ Michelson, AEOD

-. -J. J.. Fouchard, PA.

N. 'M. Haller, MPA

-..

  • H.

K~- Shapar, ELD Regi ona 1 ; Offi ces-;R:.=::I:-:. -.i* ~,,,.,...;;....;:

. - -Rl!

  • RIH RIV RV Phil l:i ps /;} : l/J H.

R~'Denton, NRR R. -H. 'vollme~. NRR r;-E. Murley, NRR.

  • R. Mattsori, NRR

. D. Eisenhut, NRR S. H~ H~naue~i NRR Willste: Jc) :6()

J. G. Davis, NMSS R ** Minogue. RES EN-81-20 IE: HQ._ ___ _

Landow

{6 mi.n)

  • J. J. Cummings, OJA
  • Air Rights.. /~. V~

. G. W. Kerr, OSP Mail Document Mgt. Br. * (PDR)

  • S~ Ebbin, NSOC
  • PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL June 12, 1981 *

)

/

... -- *--t--7"..,--"~-"',*--*

. **"--'-~--- -- *~--*---~~---

.~;;..._:P~a=-g=e"'-1-..

......__.."-"---:--.,.-----'-~.-,.;.ii.... *_. ----,.-"------------*=-~* ---.---,--__

Ju_ri_e_S "-' _1_9_81 __ _

OFFICE OF INSPECTION AND ENFORCEMENT EN-.81-20.

NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION*

. -,_*~ ~

    • Lice~s~*e:**. ~~~~~~=d~s}ower Comp~ny;. Jack.son, Michigan

..,lf!:_t{Jyf:::~

--*.-.Oocket No.** 50-255 * *

~ ~

'"'qr l 9 _(,Q

~

. -__ ~~-

... 1s81-.. :...s.

Subject:

~*. NOTICE OF VIOLATION

--\\

~~

'*,/

-~"'

It>

. "('/'*")....__

.ThisiS to inform the.ColTITlission that a.Notice of Violation will be-.-.:fsstfe:d*-tc:>"\\.

Consumers Power Company on or about June 12,*1981 *. This action is' based on -

alleged violatio!ls associated with isol_ation of the station batteries during_*

plant operation on January.6; 1981.,.The violations include:-* l) Failure to implement appropriate: procedlire_s and 2) Ina9eq~ate *adminis;trative proc_edures. *

  • .The violations. initiat~d. an Immediate ActiOn_ Letter* issued January 9, 1981 *and ari ensuing March 9, 1981 Order Confirming Licensee Actions to Upgrade Facility
  • . Perfonnance *. '. Imposition of a Civil. penalty was also considered* for this matter.

The. Interim Enforcement Policy,. ( 45 FR 66754, October 7, 1980) a i 1 ows Orders and/or civil penalties to be issued for. violations.

The staff is establishing

. a* practiCe not to issue Confirmatory Orders.and civil penalties for the same vi.olatfon unless. the act.ions can>b.e taken within a. reasonably short period. of "tiine;.the.'periOd we intend~to use as a guide is one encompassing ten.working

  • .days. -**

In this case,-the regional recommendation for civil penalties was ~ubmitted 19 working days after issuance of the Confirmatory Order, but more time passed before.the matter came to the specific attention* of the Office *Director *. -For

,this reason arid because.a civil penalty would' be solely punitive *because_ it woul.d not result in corrective actions beyond those already taken or plarrned.*

  • .in response to the Order, the decision *was made. to not 'assess a civil penalty for this event.

The deterrent e'ffect of a. Civil penalty (on otfier licensees) was cons_i dered but we concluded that ci_vn penalty action would not have such an* addi tio.na l. subs tan ti ve impact for this case at this _time.

A region~l Notice of Vi~lation will be iss~ed identifying:. 1 L the battery isolation event as a* Severity Level III violation, 2) failure to implement procedures as*a Severity Level V violation, and 3) inadequate procedures as a Severity LevelVJ violcition.

It should be noted that the licen$ee* has not.be.en.specifically informed of the

.enforcement action.

With respect to-.violation 1) above, inspection verified*

that corrective actions had been* taken *. For violations 2) and 3), *above, the licensee* is -requi'red to* respond wi,thin 30 days concerning his corrective* actions.

Foll owing NRC staff evaluation of the. response, further. enforcement action *may be considered,* based on the* adequacy of the response.

Contact:

J. I. Riesland~ IE 24939 D. Thompson, IE 24909 Distribution:

-Transmitted H St. /.'db.

Chai nnan Hendrie *

. Cammi ssioner Ahe*arne Commissioner Gilinsky S.

J~. Chilk,. SECY*

Commissioner Bradford ACRS.

C. C. -Kammerer, CA -.

Acting Director, PE (For Distribution)*

Continued on Page 2

  • ~.~age. 2.
  • Distribution continued.***

.MNss: -/.J.' tj() *.

  • W *.. J. Dircks, EDO
t. Mich~lson~ AEOD J.. J. Fouchard, PA*
  • , * ~N-~.,~*-*.M.**Halle*r; MPA:- *.*:.*
  • . H~ :,1<. :Shapar, *ELD *
  • . Phil 1 ips /.;) :* t/3

. H~

1 R. Denton, NRR...

  • R. H. Vollmer,'*NRR' T~ E. Murley, NRR.

R~. Mattson,. NRR. *.

D~ Eisenhut, NRR S. H.

Hariatier~ NRR

  • .. RegJ ona 1 Offi ces-;,;;.RI;-;*...-':i~~....;

, -,.~r, RII.

win ste !CY *:'--Ju

_. '='"RI:,.,.I'=""'I,...-+---'-~***..

  • J. G~** Davis, NMSS RIV

. R~* Minogue, RES.

RV

. EN-Sl-20 *

. IE:'HO.._. ----

  • Landow

'(6 min)

J~ ~*~. Cummings, OIA Air Rights. / :;J.: Y...S-*

G~ w. Kerr, OSP Mail*.*

DOcument Mgt. Br. (PDR).

s. Ebb in,
  • Nsoc* *

.. *PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE *UNTIL June 12, 1981 ;/


*.--*--*--=* -*--* -

.. -.--,-*.. -