consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 8, 1981 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of December 1980.

-.-.Oau.t.£ /Tl~.~

David M Kennedy General Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades Resident Inspector, Palisades CVWaits, Pll-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission BLavallee, NSAC Document Control (2) 950-22*35*10

~.,.

f'!)

U) l..1...J

(_)

>~

-)~

c~

('\\.1

~g Jl(l)) 113 *SJ i.¥3>

r

'7, \\I

(

OPERATING DATA REPORT OPERATING STATUS

1. Unit Name:

Palisades

2. Reporting Period:

801201 801231

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

2530 811. 7 805*

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes

  • 675'
  • 635 DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 1/8/81

PJBodtke, 616-764-8913
8. If Changes Occur in Capacity Ratings (Items N~mber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date 8784 744

11. Hours In Reporting Period 3957.6 490.3 i2. Numb~r Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 420.7 3767.2
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 920, 760 8,192,256
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 2,532,180 284,500 2,379,529 267,881 56.6 42.9.
20. Unit Availability_Factor
56. 6 42.9
21. Unit Capacity Factor.(Using MDC Net) 56
  • 7 42.7
22. Unit Capacity Factor (Using DER Net) 44
  • 7 33.7
23. Unit Forced Outage Rate
12. 4 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure
  • P -,1 !nf'

"'11 **1 (;) 1f:i1* 9'(fJt *.

' C* -L 'iJ1.il J 0 iU',

/

Forecast Cµmulative

'79,215 43,522.4 41,193.5 79,703,736 24,564,410 23,050,304 5'2. 0.

5.2. 0

. 45.8 36.l 34.9 Achieved (CJ/77)

.VERAGE DAILY UNIT POWER LEVEL e MO NIB December 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2*

3 4

5 6

7 8

9

.JO II 12 13 14 93 15 303 16 479 INS1RUCTIONS DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 1/8/81 PJBodtke 616-764-8913 AVERAGE DAILY POWER LEVEL (MWe-Net) 739 758 739 732 736 744 0

586 733 739 751 750 761 765 750 I**

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

l *

-I N11.

Dale 20 801201 (Contd) 21 801223 F: Forced S: Scheduled (lJ/77)

UNIT SHUTDOWNS AND POWER REDUCTiONS REPORT MONTH Dec 1980 s

296. 6 B

1 F

21. 7 A

3 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling

!)-Regulatory Restridion Licensee Event Report it E-Operator Training & License Examination F-Ad mi nist ra live G-Operational Error (Explain)

II-Other (Explain)

)*

3 Method:

I-Manual 2-Manual Scram.

3-Aulomatic Scram.

4-0ther (Explain)

DOCKET NO.

50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 1/8/81 PJBodtke 616-764-8913 Cause & Corrective Action lo Prevent Recurrence Turbine inspection and equipment repairs.

Reheat intercept valves closed causing plant trip.

4 5

Ex11ibil G *Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Suurcc

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH OF DECEMBER 1980 Reactor went critical on December 10 after outage to balance turbine and repair various pieces of equipment.

Condenser vacuum problems precipitated a slow ascension in power.

Plant ran at near full power until December 23 when the plant tripped due to inadvertent closing of the turbine.reheat intercept valves.

The reactor was taken critical later that same day and the plant was brought to full power on December 24 and remained at full power the remainder of the month.