ML18045A814
| ML18045A814 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 09/18/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18045A815 | List: |
| References | |
| NUDOCS 8010240029 | |
| Download: ML18045A814 (2) | |
See also: IR 05000255/1980012
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Ill
Docket_No. 50-255
Consumers Power Company
ATTN:
Mr. R. B. Dewitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Ja.ckson, MI
49201
Gentlemen:
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
SEP 18 l~bU
This refers to the inspection conducted by Messrs. J. F. Streeter,
P. R. Wohld, B. L. Jorgenson and J. K. Heller of our office on July 29
and August 19-20, 1980, regarding the incorrect position of containment
sump isolation valve CV-3030 on July 28, 1980, and the misoperation of
the SIRW tank isolation valve CV-3031 on August 19, 1980, experienced at
the Palisades Nuclear Generating Plant.
The report setting forth the
results of the inspection, is enclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
A separate letter setting forth certain matters of concern and the
items of noncompliance found during this inspection has been sent from
the Director, Office of Inspection and Enforcement.
Your response to
those items should be made directly to that office .
,
~
Consumers Power Company
-
2 -
Sf} 16 13Su
We will gladly discuss any questions you have concerning this
inspection.
Enclosure:
IE Inspection
Report No. 50-255/80-12
cc w/encl:
Mr. D. P. Hoffman, Nuclear
Licensing Administrator
Mr. R. W. Montross, Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
-
Local PDR
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry, Chicago
RIII
WLI
~~er/np
~oyd
9/117so
~
1
'll\\1\\~
Sincerely,
James G. Keppler
Director
Rr
RIII
N6~i~
H s~n
9i1
~r, 1
RIII
~
K
ler
q
80