ML18045A281

From kanterella
Jump to navigation Jump to search
Forwards Info Supplementing Previous Responses to NUREG-0578 Re Sys Integrity Review.Info Summarizes Sys Tests,Initial Test Results,Significant Repairs Made & post-repair Test Results
ML18045A281
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/25/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 8006300377
Download: ML18045A281 (2)


Text

.......

General Offices: 212 Welt Michigan Avenue, Jackson, Michigan 49201 * (517) 788-0550 June 25, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No 5 US Nuclear*Regulatory Comrilission Washingtori, DC 20555-DOCKET 50-255 - LICENSE DPR PALISADES PLANT - FINAL RESPONSE TO NUREG 0578, ITEM 2.1. 6a The enclosed information supplements our previous NURE.G 0578 submittals. for Item 2.l.6a, Systems Integrity ~eview.

The attached table summarizes the system tests, initial test results,.

significant repairs made and post-repair test results.

The total leak rate from all pertinent systems was 18 ml/min.

Tests on these systems will be performed at a frequency of at least once per refueling outage.

All modifications discussed under NUREG Item 2.1.6a, with t:he exception of the 1/1/81 post-accident sampling syst:em, have been completed.

    • .~if;~

David P Hoffman ~

Nuclear Licensir/J Administrator CC JGKeppler, USNRC

  • NRG Resident Inspector-Palisades Attachment (1 Page)

P,.oo J s,;,

NUREG 0578 TASK 2.1.6.a, SYSTEMS INTEGRITY PRESSURE TEST RESULTS System/Test No.

~~s~em total Si~nific~nt

)'.OmJ?one~t ComEonent Post-reg~ir l~~~l f ~~~em

.ra es.

Io ~onen ea ra*es lom~one efore repairs ea s

~~~h~aJMo #

ea rates

.rates discovered

~Psf'sh~cdora.

P67A 320ml /min Repl. seal oo ing on ainment Mech/seal (80ESS171)

Zero pray a) artem Walkd~-..n 2215 ml/min C¥-3~06

. 5 Repacked Zero I

0 rf £28 ~V§ra ion gpm ac ing (79ESS115) 1.7 ml/min b) ~~Y~R8f 1-10-80 C¥-3~31 3.5 ml/min Repacked zero c)

~~YtlR8f 3-7-80 ac ing (79ESS067)

NSSS Sampling a) ~DB MMm~;ro-0~2-5Fsi/min §ate of

~o 1f isible

.NA NA NA Zero

?9~~ g_i ~~' ~9g ¥ essurI tot' ea.age

  • e~uava e?. ?

raps min HPSI/Redundant HPSI C¥-3~18 3 ml/min ac ing a) Til~~l~!IEs 5 & 6 16 ml/min C¥-3~37 4 ml/min

~n~Fec e during ac ing

~

~s a a~pro-16 ml/min x ma el~ 2 aper-C¥-3~72 5 ml/min NA NA a ing p essure

.ac ing Vp31~2ES ac ing 3 ml/min Sont~inment Air amp ing a) ~od~f gcation Zero

~o ~isible NA NA NA Zero ea age

!r -

72~5

-~sS*Roo~ Sum~

~o ~isible NA NA NA Zero um{' re ur~ o Zero ea age con ainmen TOTAL LEAK RATES 2231 ml/min before repairs 18 ml/min FINAL I

~

~

~