ML18045A263
| ML18045A263 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/09/1980 |
| From: | Speis T Office of Nuclear Reactor Regulation |
| To: | Johnston W Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8006190783 | |
| Download: ML18045A263 (2) | |
Text
- : r:: -,.
ATTACHMENT 2 r-:rnoRANDUM FOR:
W. V.
Johnston~ Chief, Core Performance Branch, OSI FROM:
T. P. Speis, Chief, Reactor Systems ~ranch, OSI
SUBJECT:
PALISADES RELOAD REVIEW
REFERENCES:
- 1.
Letter from David P. Hoffman, Nuclear Licensing Administrator, Consumers.Power Company to Director, NRR, Palisades Plant - Technical Specifications Change Request Higher FrT for H-Fuel Cycle-4, dated May 14, 1980
- 2.
Exxon Nuclear Company, ECCS and Thermal-Hydraulic Analysis for the Palisades Reload H Design, XN-NF-80-18, April 1980 Consumers Power Company (CPC) has requested changes in their nuclear peaking factor for Cycle 4 (Ref. 1).
The changes and discussions are all physics questions and should be reviewed by CPB.
Reference 1 considers an ENC topical report (Ref. 2), which has two sections~
The first section is a partial ECCS re-analysis to account for type H fuel *.
The re-analysis involved only the hot channel and hot pin calculations for the limiting break~ It was not necessary to repeat the hydraulic analyses since the changes to type H fuel would not have a substantive hydraulic effect.
An axial shape sensitivity study was also performed.
RSB finds the ECCS results and methodology acceptable subject to review of the following items by CPB:
- 1.
Radial vs. axial peaking factor trade-off.
- 2. *Type H fuel parameters
- 3.
Acceptability of swelling and rupture model The second section of reference 2 is a thermal:-hydraulic analysis and should be reviewed by CPB.
cc:
Se~ next page Qvr~~
ruo~r7o7r5
-z/vp~~ p~~
Themis P. Speis, Chief Reactor Systems Branch Division of Systems Integration *
~ cc:
P. Check L. Rubenstein T. Wambach L. Lois D. Crutchfield CONTACT:
N. Lauben, X-27589