consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 June 3, 1980 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of May 1980.
WEAdams Senior Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades CVWaits, Pll-228B DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission Document Control (2) 950-22*35*10 80 0611,0/33
(
OPERATING DATA REPORT OPERATING STATUS I. Unit Name:
Palisades
- 675
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
7, Maximum Dependable Capacity (Net MWe):
_**_6_3_5 __ ~--
800501 - 800531 2530 811. 7 805 Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 6/3/80 PJBodtke.
616-7-64-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which.Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period i2. Numb~r Of Hours Reactor Was Critieal 744 180.6 180.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 102.6 102. 6
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 161,088 161,.088
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 2.8 50,730 50,730
- 19. Unit Service Factor 13.8 46,188 46,188
- 20. Unit Availability Factor
- 13. 8 2.8
- 21. Unit Capacity Factor (Using MDC Net) 918
- 22. Unit Capacity Factor (Using DER Net)
- 7. 7 2.0 1.6
- 23. Unit Forced Outage Rate 0
- 0.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.
Forecast Cµmulative
+
.74;078.
39,745.4 37,528*;9 71,672,568 22,082,960 20, t16*, 963 50.7 50.7
- 44. o*
- 34. 7*
36.2 Achieved
- Based o~)C911denser Backpressure 80 O~ll 1 0f.;Jfo 1
Corrected to reflect loss of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in (9/77)
April due to Daylight Savings Time
(
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE 6/3/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 17 2
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 11 27
- 61.
12 28 216 13 29 474 14 30 553 15 31 621 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
No.
Date UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH May 1980 Licensee Event Report#
c::
~~ -
0 -0
.c. ::)
Eu 8
13 (Contd 800501 s
640.5 H
14 800528 F: Forced S: Scheduled (9/77) s 0.9 B
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C'-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram.
3-Autumatic Scram.
4-0ther (Explain)
DOCKET NO.
..-.5"""0--'2"""5...... 5 ___ _
UNIT NAME Palisades DATE 6/ 3/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 Cause & Corrective Action to Prevent Recurrence TM! Modifications and anchor bolt inspections/repairs according to IEBulletin 79-02.
Turbine overspeed trip test.
4 5
Exhibit G - Instructions for Preparation of Data Entiy Sheets for Licensee Event Report (lER) File (NUREG-0161)
Exhibit I - Same Smm:e
General 5-27-80 5-28-80
SUMMARY
OF OPERATING EXPERIENCE FOR MAY 1980 The long refueling outage came to an end on 5-24-80 when the reactor was taken critical at 0544 hours0.0063 days <br />0.151 hours <br />8.994709e-4 weeks <br />2.06992e-4 months <br />.
The reactor tripped from 7% power at 0751 hours0.00869 days <br />0.209 hours <br />0.00124 weeks <br />2.857555e-4 months <br /> due to switchyard breaker being closed while the generator field breaker was also closed which caused a backfeed in the reactor protective system (spiked the pressurizer pressure signal) which signaled an inadvertent trip.
The unit was taken off line at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> for turbine overspeed trip test and was back on line at 0456 hours0.00528 days <br />0.127 hours <br />7.539683e-4 weeks <br />1.73508e-4 months <br />.