ML18044A969
| ML18044A969 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna |
| Issue date: | 02/13/2018 |
| From: | Randy Hall Plant Licensing Branch II |
| To: | Sly C Dominion Energy Co |
| References | |
| L-2018-LLA-0014 | |
| Download: ML18044A969 (3) | |
Text
1 NRR-DMPSPEm Resource From:
Hall, Randy Sent:
Tuesday, February 13, 2018 1:36 PM To:
Craig D Sly (Generation - 6)
Cc:
Diane Aitken (Generation - 6) (diane.aitken@dominionenergy.com)
Subject:
North Anna and Surry - Acceptance of Amendment Request Regarding EOF Consolidation (EPID L-2018-LLA-0014)
February 13, 2018 Mr. Craig Sly Manager, Nuclear Regulatory Affairs Virginia Electric and Power Company
Dear Mr. Sly,
By letter dated January 16, 2018 (Agencywide Documents Access and Management System Accession No. ML18025B468), the Virginia Electric and Power Company (Dominion, the licensee) submitted a license amendment request for the North Anna Power Station, Units 1 and 2, and the Surry Power Station, Units 1 and 2, and their associated independent spent fuel storage installations. The proposed amendments, if granted, would authorize changes to the NAPS and SPS emergency plans and would allow the consolidation of both sites current emergency operations facilities (EOF) into a central EOF. As the location of the consolidated EOF would be greater than 25 miles from either site, this action requires the approval of the U.S. Nuclear Regulatory Commission (NRC) itself.
The purpose of this email is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> to complete. The NRC staff plans to complete this review within 12 months, which is consistent with your requested approval date of April 1, 2019. In establishing this schedule, the staff has accounted for the need for Commission review of the proposed action. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change due to several factors, including requests for additional information, unanticipated addition of scope to the review, and review by the Commission (required in this case), NRC advisory committees, or hearing-related activities.
2 If you have any questions, please contact me at (301) 415-4032.
Sincerely, Randy Hall, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-4032 Randy.Hall@nrc.gov
Hearing Identifier:
NRR_DMPS Email Number:
161 Mail Envelope Properties (MW2PR0901MB2410CEE30B0DFF635CC8D07F92F60)
Subject:
North Anna and Surry - Acceptance of Amendment Request Regarding EOF Consolidation (EPID L-2018-LLA-0014)
Sent Date:
2/13/2018 1:36:20 PM Received Date:
2/13/2018 1:36:00 PM From:
Hall, Randy Created By:
Randy.Hall@nrc.gov Recipients:
"Diane Aitken (Generation - 6) (diane.aitken@dominionenergy.com)"
<diane.aitken@dominionenergy.com>
Tracking Status: None "Craig D Sly (Generation - 6)" <craig.d.sly@dominionenergy.com>
Tracking Status: None Post Office:
MW2PR0901MB2410.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3526 2/13/2018 1:36:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: