ML18044A737

From kanterella
Jump to navigation Jump to search
Forwards LER 80-002/03L-0
Date released: 10/31/2018 Download: ML18044A737


LER 80-002/03L-0:on 791023,during Routine Testing of Hydraulic Snubbers,Snubber S-6,located on Main Steam Line, Failed to Meet Test Acceptance Criteria.Caused by Loose Accumulator Oil Fill Fitting.Snubber Replaced
ML18044A738
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/03/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18044A738 (1)
Forwards LER 80-002/03L-0
ML18044A736
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/03/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18044A736 (2)