ML18044A534

From kanterella
Jump to navigation Jump to search
Forwards Util Program to Meet Requirements of IE Bulletins 79-02 & 79-14,consolidating Various Analyses for Future SEP & Ensuring Consistency W/Drawings.Some Seismic Category I Piping Does Not Meet FSAR Requirements
Date released: 11/06/2019 Download: ML18044A534


Proposed Amend to License DPR-20 Incorporating Plant Mods Necessary to Ensure That Seismic Category I Piping Meets FSAR Criteria
ML19296B317
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/13/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19296B317 (1)
Results & Evaluation of Tests on Phillips Red Head Self- Drilling Expansion Anchors for CPC Facility in South Haven, Mi.
ML18044A540
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/31/1980
From: Kapur S, Rotz J, Solanki N
AFFILIATION NOT ASSIGNED
To:
References
Download: ML18044A540 (86)
Results of Insp & Testing Program in Response to IE Bulletin 79-02 & Revisions (for Interim Plant Operations) for CPC Facility in South Haven,Mi, Revision 0
ML18044A539
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/11/1980
From:
BECHTEL GROUP, INC.
To:
References
Download: ML18044A539 (8)
Rept on Insp & Testing Program for Concrete Expansion Anchors Per IE Bulletin 79-02 & Revisions for CPC Facility in South Haven,Mi.
ML18044A536
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/11/1980
From:
BECHTEL GROUP, INC.
To:
References
Download: ML18044A536 (4)
Forwards Util Program to Meet Requirements of IE Bulletins 79-02 & 79-14,consolidating Various Analyses for Future SEP & Ensuring Consistency W/Drawings.Some Seismic Category I Piping Does Not Meet FSAR Requirements
ML18044A533
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/14/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: ZIEMANN D L
Office of Nuclear Reactor Regulation
References
Download: ML18044A533 (4)