UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

DEG 2 8 1979

This refers to the inspection conducted by Mr. I. T. Yin of this office

on October 26, 1979, at the NRC Region III office; on November 8-9, 1979,

at Palisades Nuclear Power Plant; on November 15-16, 1979, at the Bechtel

Associates Professional Corporation, Ann Arbor, Michigan, office; on

November 21, 1979, at the NRC Headquarters, Bethesda, Maryland, authorized

by NRC Provisional License No. DPR-20 and to the discussion of our findings

with Mr. E. R. Cooper and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure.

The application must in-

clude a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the application .

80 021 20 6 ll

Consumers Power Company

- 2 -

We will gladly discuss any questions you have concerning this

inspection.

Enclosure:

IE Inspection

Report No. 50-255/79-18

cc w/encl:

Mr. J. G. Lewis, Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sincerely,

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Ronald Callen, Michigan Public

Service Commission

Myron M. Cherry, Chicago

RI:!~

RIII

RI I I<(_...--*

RIA

~n

Yin/km

Fiorelli

Jo

nsen

12/14/79

11~!71

DEC 2 8 1979