(_ OPER.ATING DATA REPORT DOCKET NO. . 50-255 DATE 11-3-78 COMPLETED BY DIBollnow.*

TELEPHONE 616-764-8913 OPERATING ST A TUS Palisades Notes

1. Unit Name:
2. Reporting Period: 781001 to 781031
3. Licensed Thermal Power (MWt): 2530
4. Nameplate Rating (Gross MWe):* ---------=8,....,1,....,le--._7__
5. Design Electrical Rating (Net MWe): 805
6. Maximum Dependable Capacity (Gross MWe):
  • 6 75
7. Maximum Dependable Capacity (Net MWe):
  • 635
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745 7,296 60,207
12. Number Of Hours Reactor Was Critical 495.0 3,647.8 33,047.2
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 478.4, 3,282.2 31,115.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1, 172, 520 6,910,560 56,932,224
17. Gross Electrical Energy Generated (MWH) 346 '390 2,026,490 17,613,100
18. Net Electrical Energy Generated (.MWH) 325, 995 1,888,683 16,502,050
19. Unit Service Factor 64. 2% 45.0% 51.7%
20. Unit Availability Factor 64.2% 45.0% 51. 7%
21. Unit Capacity Factor (Using MDC Net) 68
  • 9% 40.8% 43.2%
22. Unit Capacity Factor (Using DER Net) 54 .4% 32.2% *34~1%
23. Unit Forced Outage Rate 35. 8%' 26.9% 39. 3% .
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0'.\*1MERCIAL OPERATION .
  • Based on Condenser Backpressure ('ci/ 77 )

Limitations 75/1/YtfJ/I/ o*

~

r *1 DOCKET NO. 50-255 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Palisades DATE 11-3-78 COMPLETED BY DIBollnow REPORT MONTH October 1978 616-764-8913 TELEPHONE r I Licensee h

"'tri c: OJ Cause & Corrective 0 "O No. Date Event 0. ':J Action to Report it Eu 0 Prevent Recurrence u

781002 F 123.4 A 1 N/A N/A N/A Leaking CRDM Seals.

781010 F 133.5 A 1 N/A* N/A N/A Leaking CRDM Seals 781011 F 9.7 A 3 N/A N/A N/A Feedwater Pump Trip 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Mainlenance or Test 2-Manual Scram. Entry Sheets ror Licensee

('-Refueling 3-Autumatic Scram. Event Report (lER) File (NUREG-D-Regulat ory Restriction 4-0ther (Explain) 0161}

E-Opcratur Training & License Examination F-Ad mi nist rat ive 5 G-Opera tiunal Error (Explain) Exhibit I *Same Source (lJ/77) I I-Other (Explain)

-..,,.... r*

AVERAGE DAILY UNIT POWER LEVEL

(~. DOCKET NO. 50-255

. UNIT PALISADES 11-3-78 DATE DIBollnow COMPLETED BY TELEPHONE 616-764-8913 MONTH October 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 723 426*

17 327 688 2 18 3 19 723 4 20 724 707 5 21 693 c

6 22 7 385 23 730 7 99. 738 8 24 728 720 9 25 10 567 26 725 739

]) 27 726 12 28 13 771 29 735 14 30 725 15 31 16 438 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

-, ' .'-"' - -~

CONSUMERS POWER COMPANY PALISADES NUCLEAR PLANT DOCKET No. 50-255

SUMMARY

OF SHUTDOWN EXPERIENCE FOR OCTOBER 1978 10-2-78 The plant was taken off-line in order to permit repairs to leaking CRDM Seals. Two seals were replaced. In addition, the position indication on one CRDM was re-zeroed, oil was added to one Primary Coolant Pump (P-50C) and changed in another Primary Coolant Pump (P-50A). The outage lasted 123.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

10-10-78 The plant was taken off-line for CRDM repairs. Seventeen seals were replaced. In addition, the Auxiliary Feedwater Pumps were repacked. This outage lasted 133.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

10-17-78 Because of a Feedwater Pump trip when attempting to change the steam supply from high pressure to low pressure steam, the Reactor tripped on low Steam Generator water level.

The plant was off-line for 9.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.