OPERA TING DATA REPORT OPERA TING STATUS I. Unit Name:

Palisades

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe ):

780901 to 780930 2530 811.. 7 805

  • 635
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (~et MWe):
  • 675 Notes DOCKET NO.

DATE CO~iPLETED BY TELEPHONE 50-255 10-4-78 DIBollnow.

616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3. Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

IO. Reasons For Restrictions, If Any:

11. Hours In Reporting Period 12..:'\\umber Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) *
17. Gross Electrical Energy Generated (MWH)
18. ~et Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate This Month 720 299.2 279.5 556,008 156,830 144,244 38.8 38.8 31.5 24.9 61.2 Yr.-to-Date 6,551 3,152.8 2,804.4 5,738,040 1,680,100 1,562,688 42.8 42.8 37.6 29.6 25.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Cumulative 5~,462 32,552.2

.30,636.6 55,759,704 17,266,710 16,176,055 51.5 51.5 42.8

. 33;8 39.3 Achieved

  • Based on Condenser Backpressure Lim~SffAons

~*, -***

No:

Date I

19 78-09-01 20 780913 21 780922 F: Forced S: Scheduled (lJ/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Sept* 1978

.-~L l'"I

'-3 en.2

.... 'J

.2 ~

"t::I.:::,.,

'lJ

~ -

t\\)

0.
l Vl

~

..c:; 0:::

~

s :I:

o-0:::

Vi ~

8 F

267.0 A

1 F

78.9 A

1 F

94.6 A

1 Reason:

A-Equipment Failure (Explain)

B*Maintcnance of Test C'*Rcfucling D-Rcgulatory Rest ril:tion Licensee Even!

Report :Jt N/A N/A N/A E-Operator Training & License Examination f*Administrnlive G-Opcrational Error (Explain)

II-Other (Explain) 3 c:

E"°

"'vi i:; "'

II) 0 'O

. ~~

0. ':l

~

Ee...;

C/'JV 0

c.i N/A N/A N/A N/A N/A N/A Method:

I-Manual 2-Manual Scram.

3*Automatic Scram.

4*0ther (Explain)

CRDM CRDM CRDM Seal Seal DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE Cause & Corrective Action to Prevent Recurrence 50-255 Palisades 10-4-78 and *pep Seal Replacem!'!nt Replacement Seal' Replacement 4

5 Exhibit G *Instructions for Preparation of Dat:i Entry Sheets for Licensee' Event Report (LER) File (NUREG*

0161)

Exhibit I

  • Same Source

(

c C

MONTH September*

e

.e A VERA GE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 10-4-78 DIBollnow 616-764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 17 236 2

18 555 3

19 577 4

20 570 5

21 673 6

22 564 7

23 8

24 9

25 10 26 133 11 27 428 374 687 12 28 381 699 13 29 714 14 30 15 31 16 45 INS1RUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting 1mmth. Compute to the nearest whole megawatl.

(9/77)

e.

CONSUMERS POWER COMPANY PALISADES NUCLEAR PLANT DOCKET NO. 50-255

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1978 9-1-78 9-1-78 9-8-78 9-12-78 9-13-78 9-16-78 9-17-78 9-22-78 At the beginning of the month, the plant was shutdo~m in continuation of an outage which began on August 28, 1978.

Amendment 42 to the Palisades Operating License was issued by the NRC.

This amendment related primarily to fire protection equipment and plant modifications associated with fire protection.

Amendment 43 to the Palisades Technical Specifications was issued by the NRC.

This amendment changed the specifications relating to axial power distribution limits.

The plant was returned to power operation, ending an outage of 267 hours0.00309 days <br />0.0742 hours <br />4.414683e-4 weeks <br />1.015935e-4 months <br /> duration.

During the outage, seven CRDM Seals were replaced, and the seals for primary coolant pumps B and D were replaced.

Because of a malfunction to the newly installed seal in the B primary coolant pump, the seal required a second replacement during the outage.

In addition to the above, a weld repair was performed to correct leakage in the Chemical and Volume Control System (CVCS) letdown line.

The plant was shutdown to permit repairs to the seal of CRDM No. 39.

The plant was returned to power operation, ending an outage of 78.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> duration.

In addition to CRDM No. 39, five other CRDM seals were replaced with rebuilt seals.

Because of the inability to withdraw CRDM No. 39, the rod's control fuses were removed and the rod was declared inoperable.

The drive mechanism failure mode indicated that the failure had occurred in the drive package, and that the rod had retained its tripping capability. Refer to LER 78-031.

The plant was shutdown to permit repairs to CRDM seals.

The plant was returned to operation on September 26, after a 94.6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> outage.

Six CRDM seals were replaced.

The drive package for CRDM 39 was replaced, and the rod was restored to an operable status (LER 78-031).