7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSEE DOCKET iVOS. 50-387 AND 50-388 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No. 79 to Facility Operating License No.
NPF-14 and Amendment No. 44 to Facility Operating License No.
NPF-22, issued to Pennsylvania Power and Light
- Company, which revised the Technical Specifications for operation of the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne
- County, Pennsylvania.
The amendments were effective as of the date of issuance, to be implemented prior to Mav 3, 1988 startup of Unit 2 following its refueling outage.
The amendments modified the Technical Specifications to revise the load
.profiles for 125V dc battery banks
- 2D612, 2D622,
- 20632, and 20642.
The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.
Notice of Consideration of Issuance of Amendments to Facility Operating license and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 22, 1988 (53 FR 9387).
No request for a hearing or petition for leave to intervene was filed following this notice.
7590-01 UNITED STATES NUCLEAR RE".ULATORY CO"MISSION LICENSEE DOCKET NOS.
50-387 AND 50-388 NOTICE OF ISSUANCE OF AMEND~FNTS TO FACILITY OPERATING L ICENSES The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No. 79 to Facility Operating License No.
NPF-14 and Amendment No. 44 to Facility Operating License No. NPF-22, issued to Pennsvlvania Power and Light
- Company, which revised the Technical Specifications for operation of the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne
- County, Pennsylvania.
The amendments were effective as of the date of issuance, to be imolemented prior to Nay 3, 1988 startup of Unit 2 following its refueling outage.
The amendments modified the Technical Specifications to revise the load profiles for 125V dc battery banks 2061?,
- 20622, 20632, and 20642.
The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.
Nntice of Consideration of Issuance of Amendments to Facility Operating license and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on %arch 22, 1988 (53 FR 9387).
No request for a hearing or petition for leave to intervene was filed following this notice.
l aSO5120qq6 BSooos87 Pgg
- BOCK 050 p>>
P
'I The Commission has prepared an Environmental Assessment related to the action and has concluded that an environmental impact statement is not warranted because there will be no environmental impact attributable to the action beyond that which has been predicted and described in the Commission's Final Environmental Statement for the facility dated June 1981.
For further details with respect to the action see (1) the application for amendments dated Januarv 8,
- 1988,
{?) Amendment No.
79 to License No.
{3) Amendment No.
44 to License No.
NPF-22, and (4) the Commission's related Safety Evaluation and Environmental Assessment.
All of these items are available for public inspection at the Commission's Public Document
- Room, 1717 H Street NM, and at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wi lkes-Barre, Pennsylvania 18701.
A copy of items {2), (3) and (4) may be obtained upon request addressed to'he U.S. Nuclear Regulatory Commission, Mashington, D.C. 20555, Attention:
Director, Division of Reactor Projects I/II.
Dated at Rockvi lie, Maryland this 25th day of April 1988.
FOR THE NUCLFAR REGULATORY COMMISSION Halter R. Butler, Director Proiect Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
~
4 h
+a
- DIST:,
.,Socket File 50-387/388 PDI-2 Reading MThadani/DFischer MO'Brien oocKETNo. 50-387/388 March 24, l988 Rules and Procedures Branch MEMORANDUMFOR:
Dlvlslon of Rules and Records Office of Admlnlstratlon
'ROM:
SULIECT1 Office of Nuclear Reactor Regulation SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 P
NNSYL ANIA P NER AND LIGHT COMPAN One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Otfice of the Federal Register for publication. Additional conformed copies (
5"
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice ot Consideration of Issuance of Facility License(s) and Notice of Opportunity forHearing.
Notice of Availabilityof NRC Draft/Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availabilityof Safety Evaluation Report.
Notice ot Issuance of Construction Permit(s).
Notice ot issuance of Facility Operating License(s) or Amendment(s)..
Order.
Exemption.
Notice ot Granting Exemption.
Environmental Assessment.
Notice ot Preparation'of Environmental Assessment.
Other.
Office of Nuclear Reactor Regulation
Enclosure:
As stated contact:
MO'Brien Phone:
2y424 OFFICE%
SURNAME
.3/2 88.......
DATE>
NRC FORM 318 uo/801 NRCM 0240 OFFICIAL RECORD COPY
h 4
I
.'<h<<f< r'>>a
~ rh ~ )l'h'<
f'hl~,',>>')
'>> "r
< '<e
>>r >>I',>>r 'rt<>>,rh 'eh, I)~ '.()
<,r".Je )P e,'
gr 'e> eh5hhl )
ws r h>>e "r ')h.
fg'
<hi 0$ rrq>>'h..r'>>.>>'h,"chh'Ch))>>
re>>>>'.'<>>"h) e i eg
~he'4 "r'", 4 ~
' 'll '
s'I 9 h
~
h rho<<
'h" <<
~.,)h' A>> ~:>>)ih.",<<>
v, qt '>>>>I
< he,...
r
=
e r
"h r
eeq,,
p <r
, l
. <r r>> /"
'r'* )<<)>>'l<>> ~ ', 3.r e
he/ >>)h <<@
'<4 l'hhr h
'>> ht>> '
1')
<<ll
'g'e< I'>>
>> f't hh
<, ~rrQ', 'e<) ee'e>>.e r>>P
<<<4 r>>
r<<
g>> '
P>>,,w
<>>e>>
- q, Q>>
rr l,l.,
r<e
<>>h.re>><'
"P<*hr ""',
l,h ",<)')I fh,>>>>Irlhhe"
>>r>>)~< CP. i>> I'h h>>l el 8 'e
>>0<>>>><>>" >>)h>>lh.')f>>
e<<'ev h l >>)'>> 8
"<<0>>e h>>he
. e) 1 fh',)r4,, ~
h>>Olz"h>>, g h
."r h' r" W3 II..I
'>>e-,)8 O','El>>rh k..
'I
>> 0, '6 "e'>>ah "hhe r>>r
" 1h'h>>
e)<1 r(r>>.e>>5 3<'>>
e h'.
I ehlh,f<,h,)" p ir )Q<<<}M r)r r~, ),)h<<e h
UNITED STATES NUCLEAR REGULATORY COMMISSION PENNSYLVANIA POWER 5 LIGHT COMPANY DOCKET NOS.
50-387 AND 50-388 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.
S. Nuclear Regulatory Commission (the Commission) is considering issuance of amendments to Facility Operating License Nos.
NPF-14 and NPF-22, issued to Pennsylvania Power 5 Light Company, (the licensee),
for operation of the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania.
ENVIRONMENTAL ASSESSMENT Identification of Pro osed Action:
The proposed amendments would revise the provisions in the Technical Specifications (TS) relating to the required. tolerance for diesel generator loading timers for Residual Heat Removal (RHR) pumps.
The proposed action is in accordance with the licensee's application for amendment dated October 15,
- 1987, as supplemented by a letter dated October 30, 1987.
The Need for the Proposed Action:
The proposed change to the TS is required in order to provide the licensee adequate upper timer setpoint tolerance for the RHR pumps to be loaded to the emergency diesel generators.
Environmental Im acts of the Proposed Action:
The Commission has completed its evaluation of the proposed revision to Technical Specifications.
The proposed revisions would allow the licensee to adjust upward (from +105 to +205) the upper margin of the sequencing timer setpoint for the RHR pump loading on the diesel generator.
The proposed changes to the timer setpoint will have a
Oe5 second margin in the time window available for RHR pump loading.
Therefore, the proposed changes do not increase the probability or consequences of accidents, no changes are being made in the types of any effluents that may be released offsite, and there is no significant increase in the allowable individual or cumulative occupational radiation exposure.
Accordingly, the Commission concludes that this proposed action would result in no significant radiological environmental impact.
With regard to potential non-radiological
- impacts, the proposed change to the TS involves systems located within the restricted area as defined in 10 CFR Part 20.
It does not affect non-radiological plant effluents and has no other environmental impact.
Therefore, the Commission concludes that there are no significant non-radiological environmental impacts associated with the proposed amendment.
The Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the Federal
~Re ister on January 28, 1988 (53 FR 2554).
No request for hearing or petition for leave to intervene was filed following this notice.
Alternative to the Pro osed Action:
Since the Commission concluded that there are no significant environmental effects that would result from the proposed action, any alternatives with equal or greater environmental impacts need not be evaluated.
The principal alternative would be to deny the requested amendment.
This would not reduce environmental impacts of plant operation and would result in reduced operational flexibility.
Alternative Use of Resources:
This action does not involve the use of any resources not previously considered in the Final Environmental Statements for the Susquehanna Steam Electric Station, Units I and 2, dated June, 1981.
A encies and Persons Consulted:
The NRC staff reviewed the licensee's request and did not consult other agencies or persons.
FINDING OF NO SIGNIFICANT IMPACT The Commission has determined not to prepare an environmental impact statement for the proposed license amendment.
Based upon the foregoing environmental assessment, we conclude that the proposed action will not have a significant effect on the quality of the human environment.
For further details with respect to this action, see the application for amendment dated October 15, 1987 and a supplement dated October 30, 1987 which are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D.C.
and at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, Pennsylvania 18701.
Dated at Rockville, Maryland, this 24th day of March FOR THE NUCLEAR REGULATORY COMMISSION 1988.
Walter Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
DIST:
-D4c@VV='i:.1'e'e)5=387/388,,
PDI-2 Read'ing NThadani/DFischer MO'Brien oocKETNo.
50-387/388 March 24, 1988 Rules and Procedures Branch MEMORANDUMFOR:
Division of Rules and Records Office of Administration FROM:
SUBJECT:
Office of Nuclear Reactor Regulation SUS UEHANNA STEAN ELECTRIC STATION UNITS 1 AND 2 NN AN A W
R N
C N
One signed original of the Federel Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (
5
) ot the Notice are enclosed for your use.
0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
CI Notice of Receipt ot Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.
0 Notice of Consideration of Issuance of Amendment to Facility Operating License.
G Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice ot Opportunity for Hearing.
Notice of Availabilityof NRC Draft/Final Environmental Statement.
D Notice of Limited Work Authorization.
Notice of Availabilityof Satety Evaluation Report.
0 Notice of Issuance of Construction Permit(s).
Notice of Issuance of Facility Operating License(s) or Amendment(s).
CI Order.
0 Exemption.
Cl Notice of Granting Exemption.
Environmental Assessment.
0 Notice ot Preparation of Environmental Assessment.
Other.
Office of Nuclear Reactor Regulation
Enclosure:
As stated
Contact:
MO'Br ken 21424 FFICK>
NAME OATEN
.3/2 88..
FORM 31$ noie01 NRCM 0240 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION PENNSYLVANIA POWER 5 LIGHT COMPANY DOCKET NOS.
50-387 AND 50-388 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.
S. Nuclear Regulatory Commission (the Commission) is considering issuance of amendments to Facility Operating License Nos.
NPF-14 and NPF-22, issued to Pennsylvania Power 5 Light Company, (the licensee),
for operation of
'the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania.
ENVIRONMENTAL ASSESSMENT Identification of Pro osed Action:
The proposed amendments would revise the provisions in the Technical Specifications (TS) relating to the required tolerance for diesel generator loading timers for Residual Heat Removal (RHR) pumps.
The proposed action is in accordance with the licensee's application for amendment dated October 15,
- 1987, as supplemented by a letter dated October 30, 1987.
The Need for the Pro osed Action:
The proposed change to the TS is required in order to provide the licensee adequate upper timer setpoint tolerance for the RHR pumps to be loaded to the emergency diesel generators.
Environmental Im acts of the Proposed Action:
The Commission has completed its evaluation of the proposed revision to Technical Specifications.
The proposed revisions would allow the licensee to adjust upward (from +105 to +20%) the upper margin of the sequencing timer setpoint for the RHR pump loading on the diesel generator.
The proposed changes to the timer setpoint will have a
Oe5 second margin in the time window available for RHR pump loading.
Therefore, the proposed changes do not increase the probability or consequences of accidents, no changes are being made in the types of any effluents that may be released offsite, and there is no significant increase in the allowable individual or cumulative occupational radiation exposure.
Accordingly, the Commission concludes that this proposed action would result in no significant radiological environmental impact.
With regard to potential non-radiological
- impacts, the proposed change to the TS involves systems located within the restricted area as defined in 10 CFR Part 20.
It does not affect non-radiological plant effluents and has no other environmental impact.
Therefore, the Commission concludes that there are no significant non-radiological environmental impacts associated with the proposed amendment.
The Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the Federal
~Re ister on January 28, 1988 (53 FR 2554).
No request for hearing or petition for leave to intervene was filed following this notice.
Alternative to the Pro osed Action:
Since the Commission concluded that there are no significant environmental effects that would result from the proposed action, any alternatives with equal or greater environmental impacts need not be evaluated.
The principal alternative would be to deny the requested amendment.
This would not reduce environmental impacts of plant operation and would result in reduced operational flexibility.
Alternative Use of Resources:
This action does not involve the use of any resources not previously considered in the Final Environmental Statements for the Susquehanna Steam Electric Station, Units 1 and 2, dated June, 1981.
A encies and Persons Consulted:
The NRC staff reviewed the licensee's request and did not consult other agencies or persons.
FINDING OF NO SIGNIFICANT'MPACT The Commission has determined not to prepare an environmental impact statement for the proposed license amendment.
Based upon the foregoing environmental assessment, we conclude that the proposed action will not have a significant effect on the quality of the human environment.
4 t
r
4-For further details with respect to this action, see the application for amendment dated October 15, 1987 and a supplement dated October 30, 1987 which are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D.C.
and at the Osterhout Free Library, Reference Department, 71 South Frarklin Street, Wilkes-Barre, Pennsylvania 18701.
Dated at Rockville, Maryland, this 24th day of March 1988.
FOR THE NUCLEAR REGULATORY COMMISSION Walter Butler, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
/