PRIORITY 1 (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9507050458 DOC.DATE: 95/06/23 NOTARIZED: NO FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha AUTH.NAME AUTHOR AFFILIATION TERRY,C.D.
Niagara Mohawk Power Corp.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000410 P
SUBJECT:
Concludes that all GL 88-14 IAS improvements, as identified in listed NMP correspondence, completed at facility.
DISTRIBUTION CODE:
A048D COPIES RECEIVED:LTR J ENCL ~ SIZE:
TITLE: OR/Licensing Submittal:
Equipment Qualify'.cation GLs 88-14
& 89-15 NOTES:
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: ACRS NRR/DE/EMEB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G Ol NRR/DSSA/SPLB RES/DSIR/EIB NRC PDR COPIES LTTR ENCL D
N NOTE TO ALL "RZDS" RECZPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5D8 (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL ~ 0
~ ~
0
~M0
t
. Nl V HIIASAIRA
-KlU MC)M%INK NIAGARAMOHAWKPOWER CORPORATION/NINE MILEPOINT NUCLEAR STATION, P.O. BOX 63, LYCOMING,N.Y.13093 fTEL(315) 349-7263 FAX(315) 349.4753 CARL D. TERRY Vice President Nuclear Engineering June 23, 1995 NMP2L 1554 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
Nine MilePoint Unit 2 Docket No. 50-410 NPF-
Subject:
Generic Letter S8-14, "Instrument AirSupply System Problems Affecting Safety-Related Equipment" Gentlemen:
On August 8, 1988, the Nuclear Regulatory Commission issued Generic Letter 88-14, "Instrument AirSupply System Problems Affecting Safety-Related Equipment."
The purpose of this generic letter was to request that each plant perform a design and operations verification of the instrument air system (IAS).
Niagara Mohawk Power Corporation (NMPC) responded to Generic Letter 88-14 for Nine Mile Point Unit 2 in letters dated April 1, 1989 (NMP2L 1193) and January 11, 1991 (NMP2L 1276).
In these letters, Niagara Mohawk stated that a program to perform a design and operations verification and to increase the reliability of the IAS would be conducted in three phases.
By letter, dated June 18, 1991, the Staff concluded, based upon the content of Phase I, that Niagara Mohawk had fulfilledthe requirements of Generic Letter 88-14 for Nine Mile Point Unit 2. Additionally, the Staff requested that it be notified in writing when system improvements have been implemented that would increase the reliability of the IAS.
Additional Phase II and IIIinformation was provided to the Staff in letters dated December 20, 1991 (NMP2L 1330) and December 22, 1993 (NMP2L 1458).
As indicated in our December 22, 1993 letter, IAS improvements were completed during the 1993 refueling outage with the exception of verification of IAS P&IDs enhancements.
Since then, IAS walkdowns and appropriate P&ID revisions have been completed.
Therefore, Niagara Mohawk concludes that all Generic Letter 88-14 IAS improvements, as identified in the above NMPC correspondence, have been completed at NMP2.
Very truly yours, fear g C. D. Terry Vice President - Nuclear Engineering CDT/KWK/kab,
<y507050458
+50irt23 PDR ADQCK 05000410 P
Page 2 xc:
Regional Administrator, Region I Mr. B. S. Norris, Senior Resident Inspector Mr. L. B. Marsh, Director, Project Directorate I-l, NRR Mr. G. E. Edison, Senior Project Manager, NRR Records Management
0 ew
~/p