Submits RAI Re Plant,Units 2 & 3 P/T Curves,In Order to Complete Review.Proposed Changes Would Revise Reactor Vessel P/T Limits
ML18039A578
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/19/1998
From: De Agazio A
NRC (Affiliation Not Assigned)
To: Scalice J
TENNESSEE VALLEY AUTHORITY
References
TAC-MA1304, TAC-MA1305, NUDOCS 9810210213
Download: ML18039A578 (12)


Text

Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 October 19, 1998

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 2, AND 3 REQUEST FOR ADDITIONALINFORMATIONREGARDING BROWNS FERRY UNITS 2 AND 3 PRESSURE-TEMPERATURE CURVE UPDATE (TAC NOS. MA1304 and MA 1305)

Dear Mr. Scalice:

By letter dated March 3, 1998, the Tennessee Valley Authority (TVA)submitted proposed changes (TS-393) to the Browns Ferry Nuclear Plant, Units 2 and 3 Appendix A Technical Specifications. The proposed changes would revise the reactor vessel pressure-temperature (P/T) limits for Browns Ferry Units 2 and 3. The proposed changes would extend the validity of the curves to 32 effective full-power years (EFPY). The current P/T curves are effective up to 12 EFPY.

In reviewing the submittal, the staff has determined that the following information is required to complete the review.

1.

The adjusted reference temperature (ART) calculations for all beltline, flange, and bottom head materials that were not included in your submittal.

2.

Ifthe N16 instrumentation nozzles are located in the beltline regions of the Browns Ferry reactor pressure vessels, then include the ART calculations for the instrumentation nozzles among the ART calculations for the materials in Question 1.

This request was discussed with Mr. Tim Abney on October 15, 1998. A target response date of November 16, 1998, was agreed to. However, Mr. Abney agreed that, ifpossible, the material willbe submitted sooner to enable the staff to issue the proposed amendment by December 31, '1 998.

Sincerely, Original signed by:

98i02i02iS 98i019

--(

PDR ADQCK 05000260 P

PDR Albert W. De Agazio, Sr. Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-260, 50-296 Serial No. BFN-98-030 cc: See next page ccw/encl:

See next page

!!~n I";-qp ~,",

!!'!'~.:

> L!'i Pg DOCUMENT NAME: G:)BFNN1304RAI.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Cop with attachment/enclosure "N" = No co y OFFICE NAME DATE PN: PDII-3 E

LA:PDZI-3 ADeAgazi BClayton 10/

/98 10/

/98 D:PDZZ-3 FHebdon 10/

/98 10/

/98 10/

/98 Official Record Copy

r t l

Date:

(october 19, 1998 S

IBUTI N P.ocFee:FIWe PUBLIC PDII-3 R/F J. Zwolinski (A)

F. Hebdon B. Clayton A. DeAgazio OGC ACRS L. Plisco, Region II K. Wichman

Date:

October 19, 1998 D

T B TIO Docket File PUBLIC PDII-3 R/F J. Zwolinski (A)

F. Hebdon ACRS B. Clayton L. Plisco, Region II A. De Agazio K. Wichman OGC

~ I'1

r Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 2, AND 3 REQUEST FOR ADDITIONALINFORMATIONREGARDING BROWNS FERRY UNITS 2 AND 3 PRESSURE-TEMPERATURE CURVE UPDATE (TAC NOS. MA1304 and MA 1305)

Dear Mr. Scalice:

By letter dated March 3, 1998, the Terinessee Valley Authority (TVA)submitted proposed changes (TS-393) to the Browns Ferry Nuclear Plant, Units 2 and 3 Appendix A Technical Specifications. The proposed changes would revise the reactor vessel pressure-temperature (P/T) limits for Browns Ferry Units 2 and 3. The proposed changes would extend the validity of the curves to 32 effective full-power years (EFPY). The current P/T curves are effective up to 12 EFPY.

In reviewing the submittal, the staff has determined that the following information is required to complete the review.

1.

The adjusted reference temperature (ART) calculations for all beltline, flange, and bottom head materials that were not included in your submittal.

2.

Ifthe N16 instrumentation nozzles are located in the beltline regions of the Browns Ferry reactor pressure vessels, then include the ART calculations for the instrumentation nozzles among the ART calculations for the materials in Question 1

~

This request was discussed with Mr. Tim Abney on October 15, 1998. A target response date of November 16, 1998, was agreed to. However, Mr. Abney agreed that, ifpossible, the material will be submitted sooner to enable the staff to issue the proposed amendment by December 31, 1998.

Sincerely, Original signed by:

Albert W. De Agazio, Sr. Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No: 50-260, 50-296 Serial No. BFN-98-030 cc: See next page cc w/encl: See next page DOCUMENT NAME: G:>BFNIA1304RAI.WPD To receive a copy of this document; indicate in the box: "C" = Copy without attachment/enclosure "E" = Cop with attachment/enclosure "N"= No co OFFZCE PM:PDZZ-3 E

LA:PDZZ-3 D:PDZZ-3 NAME DATE ADeAgazi 10/

/98 BClayton 10/

/98 FHebdon 10/ '98 10/

/98 10/

/98 Official Record Copy

0

~

(

C'

) 'e Rf00

~4

~o Cy i~

O I

IA0 Vg gO

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 October 19, 1998 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 2, AND 3 REQUEST FOR ADDITIONALINFORMATIONREGARDING PRESSURE-TEMPERATURE CURVE UPDATE (TAC NOS. MA1304 and MA 1305)

Dear Mr. Scalice:

By letter dated March 3, 1998, the Tennessee Valley Authority (TVA)submitted proposed changes (TS-393) to the Browns Ferry Nuclear Plant, Units 2 and 3 Appendix A Technical Specifications. The proposed changes would revise the reactor vessel pressure-temperature (P/T) limits for Browns Ferry Units 2 and 3. The proposed changes would extend the validity of the curves to 32 effective full-power years (EFPY). The current P/T curves are effective up to 12 EFPY.

In reviewing the submittal, the staff has determined that the following information is required to complete the review.

1.

The adjusted reference temperature (ART) calculations for all beltline, flange, and bottom head materials that were not included in your submittal.

2.

Ifthe N16 instrumentation nozzles are located in the beltline regions of the Browns Ferry reactor pressure vessels, then include the ART calculations for the instrumentation nozzles among the ART calculations for the materials in Question 1.

This request was discussed with Mr. Tim Abney on October 15, 1998. A target response date of November 16, 1998, was agreed to. However, Mr. Abney agreed that, ifpossible, the material willbe submitted sooner to enable the staff to issue the proposed amendment by December 31, 1998.

Sincerely, Albert W.

eAgazio, Sr. Pr 't Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-260, 50-296 Serial No. BFN-98-030 cc: See next page

C'

~

C 0

Mr. J. A. Scalice Tennessee Valley Authority BROWNS FERRY. NUCLEAR PLANT CC:

Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Jack A. Bailey, Vice President Engineering 8 Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. C. M. Crane, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority ET 10H 400 West Summit Hill Drive Knoxville, TN 37902 Mr. Raul R. Baron, General Manager Nuclear Assurance Tennessee Valley Authority 5M Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Karl W. Singer, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Mark J. Burzynski, Managar

'uclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL35609 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant I0833 Shaw Road Athens, AL35611 State Health Officer Alabama Dept. of Public Health 434 Monroe Street Montgomery, AL36130-1 70I Chairman Limestone County Commission 31 0 West Washington Street Athens, AL 35611

~

~

~

, ~

~

g~

Wh. i l

T t