Forwards LER 95-003-02 Re Unit 2 SRVs Exceeding TS Setpoint Limit During Tests Performed During Unit 2 Cycle 7 Refueling Outage
Date released: 09/27/2018 Download: ML18038B850


LER 95-003-02:on 950301,Unit 2 Main Steam SRVs Failed Setpoint Acceptance Tests.Caused by Corrosion Bonding of SRV Pilot Disc/Seat Interface Resulting in Upward Setpoint Drift.Valves Currently Being Retested & Recertified