ML18038B825
| ML18038B825 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/07/1997 |
| From: | Abney T TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18038B826 | List: |
| References | |
| IEB-80-13, NUDOCS 9703180230 | |
| Download: ML18038B825 (10) | |
Text
CATEGOH.Y REGULA
. Y INFORMATION DISTRIBUTION jSTEM (RIDS)
ACCESSION NBR:9703180230 DOC.DATE': 97/03/07 NOTARIZED:
NO DOCKET FACIL:50-296 Browses Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION ABNEYPT.E.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
r'orwards rev 1 to "Evaluation of Indications on Browns Ferry 3 Annulus Core Spray Piping a Rev 1 to "Internal Core Spray Line Flaw Evaluation Handbook for Browns Ferry...,per IE Bulletin 80-13.Repts discussed.
Summary of commitments encl.
DISTRIBUTION CODE:
IEIOD COPIES RECEIVED! LTRj ENCL J SIZE: 8 TITLE: 50 Dkt Augmented Inspection Team (AIT) Reports/Correspondence NOTES:
RECIPIENT ID CODE/NAME PD2-3-PD INTERNAL: ACRS AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM NRR/DRPM/PERB NRR/DSSA/DIR OE/DIR OGC/HDS3 EXTERNAL:
QNPO RECORD CTR NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME WILLIAMS,J.
A'EOD/DO NRR/DRCHyiiHFB NRR/DRPM/PECB NRR/DRPW NUDOCS-ABSTRACT OEDO RGN2 FILE 01 NOAC NUDOCS FULLTEXT C.P S
LTTR ENCL 1
1 1
5 5
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE 'DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
/
TOTAL NUMBER OF COPiES REQUiRED; LTTR 28 ENCL 28
) s(,.,~
I l
Tennessee Valley Authority, Post Olfice Box 20GO. Decatur. Ataoarna 35609 200C March 7, 1997 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555
'Gentlemen:
In the Matter of Tennessee Valley Authority II Docket No. 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 3 REACTOR PRESSURE VESSEL INTERNALS'UGMENTED WELD INSPECTION EVALUATION OF INDICATIONS AT THE CORE SPRAY SYSTEM PIPING COLLAR-TO-SHROUD WELD In accordance with IE.Bulletin 80-13, "Cracking in Core Spray Spargers,"
TVA is submitting a structural evaluation of the core spray piping considered indications identified during ultrasonic (UT) examinations of the Core Spray (CS) piping collar-to-shroud welds.
The examinations were conducted using the industry guidance contained in the Boiling Water Reactor Vessel and Internals Project (BWRVIP) document, "Core Spray Internals Inspection and Flaw Evaluation Guidelines (BWRVIP-18)," dated.July 26, 1996.
~'he evaluation concluded that the CS system function is not compromised and the indications are'cceptable for continued operation during the next fuel cycle without repair.
The evaluation was performed considering the flawed,weld to be fully cracked, thus not capable of carrying load.
In
The result is that, even with the shroud to collar weld considered disengaged, the core spray piping meets design basis requirements.
Based on the conclusions in this
- report, TVA will submit its plans for reinspection or repair of the Unit 3
CS system piping, internal to the reactor pressure
- vessel, to NRC at least three months prior to the
~
. start of the next refueling outage, currently scheduled to begin in October 1998.
9703180230 970307
)j' PDR ADOCK 05000296 6
PDR IlllflllllllljIIIJlltlllIlflllltllIIIIIIIII
I<
11
U.S. Nuclear Regulatory.Commission Page 2
March 7.',
1997 Enclosure 1 to this letter contains TVA's report describing the results of the structural evaluation of the subj'ect weld indications.
Enclosure 2 provides a summary qf the commitment described in this letter.
If you have any questions regarding this evaluation please call me at (205) 729-2636.
sigcerely T.
E. Abney Manager ofcensi and'ndust Aff g,irs Enclosures cc:
(Enclosures)
Mr. Mark.S.
Lesser.,
Branch'Chief
.U.S'. Nuclear Regul'atory,Commission.
Region II 101 Marietta Street, NW, Suite 2900
,Atlanta, Georgia 30323 NRC Resident Inspector
.Browns Ferry Nuclear Plant
'10833 Shaw Road.
- Athens, Alabama 35611 Mr. J.
F.. Wil'liams, Project Manager U.S.. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville', Maryland 20852
0
~
t
ENCLOSURE TENNESSEE'ALLEY AUTHORITY BROWNS'ERRY NUCLEAR PLANT,(BFN)
UNIT 3 CORE SPRAY. SYSTEMS AUGMENTED WELD INSPECTION EVALUATION...OF INDICATIONS AT THE COLLAR-TO-SHROUD WELD (SEE ATTACHED),
0
, ~
ENCLOSURE 2
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UN1T 3 CORE SPRAY SYSTEMS AUGMENTED WELD INSPECTION@
EVALUATION OF INDICATIONS AT THE COLLAR-TO-SHROUD WELD COMMITMENT
SUMMARY
TVA will submit its plans to NRC for the reinspection or repair of the BFN Unit 3 Core Spray System piping, internal to the reactor pressure
- vessel, three months prior to the start of the Cycle 8 refueling outage.