Response to Clarification of Initial Response to a Notice of Violation and Nuclear Regulatory Commission Inspection Report 05000416/2017012
ML18038B584
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/07/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Emily Larson
Entergy Operations
References
IR 2017012
Download: ML18038B584 (3)


See also: IR 05000416/2017012

Text

February 7, 2018

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION

OF INITIAL RESPONSE TO A NOTICE OF VIOLATION AND NUCLEAR

REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012

Dear Mr. Larson:

Thank you for your letter of December 21, 2017, (ML17362A041) which provided clarifying

information to supplement your September 21, 2017, reply (ML17269A031) to the Notice of

Violation concerning calibration of the main steam line and containment/drywell high range

radiation monitors. The Notice of Violation was issued on August 22, 2017, in NRC Inspection

Report 05000416/2017012 (ML17235B265).

The NRC identified several discrepancies in your initial response that required clarification.

We have reviewed these clarifications in conjunction with your initial response to the Notice of

Violation and find that they address the violation and the corrective actions taken. Following

review of your responses to the Notice of Violation, we concluded that the surveillances

performed on the main steam line and containment/drywell high range radiation monitors in

response to the Notice of Violation demonstrate reasonably accurate instrument

responses. However, the changes to the calibration procedures themselves warrant additional

review. In particular, we noted that the procedures continue to allow tolerances significantly

wider than industry norm. We will review the implementation of your corrective actions during a

future inspection to determine that full compliance has been achieved and will be maintained.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter will be made available electronically for public inspection in the NRC Public Document

Room or from the NRCs Agencywide Documents Access Management System (ADAMS),

accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.

E. Larson

2

The NRC also includes significant enforcement actions on its Web site at

https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/.

Sincerely,

/RA/

Heather J. Gepford, Ph.D., CHP

Chief, Plant Support Branch 2

Division of Reactor Safety

Docket No. 50-416

License No. NPF-29

cc: Electronic Distribution

ML18038B584

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JJO Yes No

Publicly Available Sensitive

NRC-002

OFFICE

HP:DRS/PSB2

C:DRS/PSB2

C:DRP/PBC

C:DRS/PSB2

NAME

JODonnell

HGepford

JKozal

HGepford

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE

2/6/18

2/618

2/7/18

2/7/18