ML18038A895

From kanterella
Jump to navigation Jump to search
Corrected Pages to Amend 154 to License DPR-52
ML18038A895
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/12/1994
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18038A893 List:
References
NUDOCS 9409140137
Download: ML18038A895 (4)


Text

CORRECTION TO LICENSE AMENDMENT NO.

154 FACILITY OPERATING LICENSE NO.

DPR-52 DOCKET. NO. 260 Revise the Appendix A Technical Specifications by removing the pages identified below and. inserting the enclosed pages.

The corrections to the pages are identified by the marginal lines.

Remove Insert

.3.9/4.9-9 3.9/4.9-10 3.9/4.9-9 3.9/4.9-10

.-h1S 18//S q ENCLOSURE 9409X40~m 9409i2H PDR ADOCK 05000259 P

.t Dgj

41

'gt '

'.9.B.

4.9.B.

3.

When one of the units 1

and 2 diesel generator is, INOPERABLE, continued REACTOR POWER OPERATION is permissible during the succeeding 7 days, provided that

2. offsite power sources are available as specified i'n 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)
systems, and the remaining three units 1 and 2 diesel generators are OPERABLE.

If this requirement cannot be met, an orderly shutdo~ shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.

When one of the units 1 and 2 diesel generators is found to be INOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified.

within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

4.

When one units 1 and 2

4-kV shutdown board is INOPERABLE, continued'EACTOR POWER OPERATION is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the 'remaining. 4-kV shutdown boards and associated diesel generators,,CS, RHR (LPCI and containment cooling)

systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
met, an orderly shutdown shall be initiated and'he reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.

When one 4-kV shutdown board is found to be INOPERABLE, all diesel generators associated with the remaining 4-kV shutdown boards shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining 4-kV shutdown boards shall be verified within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

BFN Unit 2 3.9/4.9-'9

'AMENDMENTNO. y 5 g

4

~ 3.9.B..

5.

When one of the shutdown buses is INOPERABLE, REACTOR POWER OPERATION is permissible for a period of 7 days.

4.9.B.

EQ1LiJJ~

5.

When a shutdown bus is found to be INOPERABLE, all 1 and 2 diesel generators shall be proven OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

6.

When one of the 480-V diesel auxiliary boards becomes INOPERABLE, REACTOR POWER OPERATION is permissible for a period of 5 days.

6.

When one units 1

and 2 diesel auxiliary board is found to be INOPERABLE, each unit 1 and 2 diesel generator shall be proven OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining diesel auxiliary board shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8

hours thereafter.

7.

From and after the date that one of the three 250-V unit batteries and/or its associated battery board is found to be INOPERABLE for any

reason, continued REACTOR POWER OPERATION is permi'ssible during the succeeding 7 days.

Except for routine surveillance

testing, NRC shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the situation, the precautions to be taken during this period, and the plans to return the failed component to an OPERABLE state.

BFN Unit 2 3.9/4.9-10 AMENOMBfTgg. yg g