CORRECTION TO LICENSE AMENDMENT NO.

158 FACILITY OPERATING. LICENSE NO.

DPR-33 DOCKET NO. 50-259 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.

The corrections to the pages are identified by the marginal lines.

Remove Inser t 3 '/4,9-9.

3.9/4.9-10 3.9/4.9-9 3.9/4.9-10 ENCLOSURE

'W09140i32 9409i2 PDR ADOCK 05000259 P

PDR

4i I

I

'.9.B.

3.

When one of'he units 1

and 2 diesel generator is INOPERABLE, continued

'REACTOR POWER OPERATION permissible during. the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)

systems, and the remaining three units 1 and 2 diesel generators are OPERABLE.

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor.

shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />..

4.9.B.

F41LLQERIN 3.

When one of the units 1 and 2

diesel'enerators is found to be INOPERABLE',

all of the. remaining diesel generators shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

4.

When one units 1 and 2

4-kV shutdown board is INOPERABLE, continued REACTOR POWER OPERATION is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generators, CS, RHR (LPCI and containment cooling)

systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.

When one 4-kV shutdown board is found to be INOPERABLE, all diesel generators associated with the remaining 4-kV shutdown boards shall be demon-strated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining 4-kV shutdown boards shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once. per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

BFN Unit 1

3.9/4.9-9 AMENDMENTNO. y 5 8

" 3.9.B.

4.9.B.

5.

When one of the shutdown buses is INOPERABLE, REACTOR POWER OPERATION is permissible for a period of 7 days.

5.

When a shutdown bus is found to be INOPERABLE, all l and 2 diesel generators shall be proven OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

6.

When one of the 480-V diesel auxiliary boards becomes INOPERABLE, REACTOR POWER OPERATION is permissible for a period of. 5 days.

6.

When one units 1

and 2 diesel auxiliary board is found to be INOPERABLE, each unit 1 and' diesel generator shall be proven.

OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining diesel auxiliary board shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8,

hours thereafter.

From and after the date that one of the three 250-V unit batteries and/or its associated battery board is found to be INOPERABLE for any

reason, continued REACTOR POWER OPERATION is permissable during the succeding 7 days.

Except for routine surveillance

testing, NRC shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the situation, the precautions to be taken during this period, and the plans to return the faile'd component to an OPERABLE state.

BFN Unit 1

3,9/4.9-10 AMENOMENT NO. 158

0

<I