ML18038A769

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 89-172 W/Util on 891030 at Region I Ofc to Hold Enforcement Conference to Discuss Use of Radwaste Bldg Subbasement as long-term Liquid Waste Retention Facility
ML18038A769
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/20/1989
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8910310060
Download: ML18038A769 (4)


Text

U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No.89-172 Licensee:

Facility:

Docket No.:

w Time and Date:

Location:

Purpose:

NRC Attendees:

Niagara Mohawk Power Corporation Nine Mile Point Unit 1 50-220 11:00 A.M., October 30, 1989 USNRC Region I, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room Enforcement Conference on the Use of the Radwaste Building Sub-Basement as a Long-Term Liquid Waste Retention Facility (Augment Inspection Team Report No. 50-220/89-80)

M. Knapp, Director, Division of Radiation Safety and Safeguards (DRSS)

R. Bellamy, Chief, Facilities Radiological Safety and Safeguards (DRSS)

J. Wiggins, Chief, Reactor Projects Branch No.

1, Division of Reactor Projects (DRP)

,- G. Meyer, Chief, Reactor Projects Section No.

1B, DRP W. Pasciak, Chief, Facilities Radiation Protection

Section, DRSS R. Capra, Director, Project Directorate I-1, Office of Nuclear Reactor Regulation (NRR)

W. Cook, Senior Resident Inspector Licensee Attendees:

L. Burkhardt, Executive VP Nuclear Operations J. Willis, General Station Superintendent S.

Wi lczek, Manager, Licensing

'N.

Spagnoletti,

Manager, Corporate Health Physics C. Gerber, Radwaste Supervisor "The Date was changed from October 23,
1989, as scheduled in the October 2, 1989 AIT Forwarding Letter due to Niagara Mohawk's request for additional preparation time.

Note:

Enforcement Conferences are not open for public observation.

Attendance by NRC personnel at this meeting should be made known by October 27,

1989, via telephone call to Glenn Meyer, Regio I, at FTS 46-5183.

Prepared by:

Glenn W. Meyer, hief Reactor Projects Sect n No.

1B 8'V10310060 991020 PDR ADOCK 05000220 G

PNU

ll~-

/

A

z r Meeting Notice No.89-172, OCT 20 1989 Distribution:

J. Taylor, Acting Executive Director for Operations,(ED)

Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director.for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J.

Lieberman, Director, Office of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR S.

Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Regi,on I Reactors, NRR R. Capra; Director, Project Directorate I-1, NRR M. Slosson, Project Manager, PD I-l, NRR, J.

Dyer, Regional Coordinator, EDO Public Document Room (PDR)

I Local Public Document Room (LPDR)

State of New York NRC Resident Inspector bcc:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

M. Miller, RI J.

McGrath, RI Regional Counsel D. Holody, RI C. White, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J.
DiOonato, DRP RI: DRP GMeyer/mjd 10/~/89 RI: DRP JWiggins 4$j 10/.p/89 OFFICIAL RECORD COPY MEETING NOTICE NO.89-172 10/20/89 0002.0.0

I